19
COMUNELLO
®Copyright 2013 - All right reserved
ENGLISH
2 PRODUCT DESCRIPTION AND
INTENDED USE
2.1 PRODUCT DESCRIPTION
Electromechanical articulated arm operator designed for use with
lightweight structures and for single leaves up to 2.2 metres and 3.5 metres.
Composed of a compact aluminium housing and die cast alloy arm.
2.2 TYPICAL INSTALLATION
E
C
C
B
F
B
A
A
D
KEY
A OPERATOR
B OPENING PHOTOCELLS
C CLOSING PHOTOCELLS
D FLASHING LIGHT
E KEY SELECTOR SWITCH
F CENTRAL CLOSING STOP
3 TECHNICAL SPECIFICATIONS
CONDOR 220
CONDOR 350
Power supply
230 ~ 50 Hz
Operator power supply
24V
ONE 24V
230V ~
24V
ONE 24V
Power consumption
110 W
280 W
150 W
Current input
5 A
1,2 A
6,5 A
Torque
150 Nm
250 Nm
200 Nm
Duty cycle
30%
Intensive use
Protection rating
IP 24 D
Insulation class
1 earth
1 earth
II
Working temperature
from -20°C to + 50°C
Speed
0,10 rad/s
Weight
10 Kg
10 Kg
10 Kg
LEAF WEIGHT (Kg)
LEAF LENGHT (m)
LIMITS OF USE - CONDOR 220
0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 375
1.5
2
2.5
2.75
3
3.25
3.5
LEAF WEIGHT (Kg)
LEAF LENGHT (m)
LIMITS OF USE - CONDOR 350
4
INSTALLATION
4.1 PRELIMINARY CHECKS
Ensure that all material used is in perfect condition and fit for purpose.
• Make sure that the mechanical structure of the gate is suitable for
automation. This product cannot be used to automate a gate unless
the gate is already in good working order and safe and it cannot remedy
defects caused by incorrect installation or lack of maintenance of the
gate.
• Check the stated operating limits.
• Move the gate leaves manually in both directions to ensure the force
required is constant throughout the full range of movement.
• Move the gate leaves manually to any position then release them to
check that they remain stationary.
• Check that the area in which the operator is to be mounted is compatible
with the size of the unit and make sure there is sufficient clearance for
the full movement of the arm.
• Ensure that there is sufficient space around the operator to perform the
manual release procedure.
• Ensure that the surfaces on which the devices are to be mounted are
solid and able to provide a secure anchorage.
• Ensure that all devices to be installed are in a protected location and
such as to minimize the risk of accidental impact.
4.2 OPERATING LIMITS
Before starting the installation work make sure the operator is correctly sized
in relation to the dimensions and length of the gate leaves and within the
limits of the values given in the chapter “Product technical specifications”:
For installation purposes the minimum width of the gate pillar is 200mm.
The operator arm must be secured to the gate leaf in a sufficiently robust
position (e.g. on the gate frame).
4.3 PREPARATORY WORK FOR INSTALLATION (FITTING
THE ARTICULATED ARMS)
• Release the operator (see heading 4.4.3)
• Assemble arm 1 and arm 2 (FIG. 3)
• Fix the arms to the drive shaft (FIG. 4)
• Fit the cover and secure it with the two screws supplied (FIG. 5).
The sole difference between the LH and RH leaves lies in the position
of arm 2.
4.4 INSTALLATION
4.4.1 INSTALLATION:
• With reference to FIG. 1 measure distance D and, depending on the
required opening angle, you can obtain dimensions B and A.
• Check that the arm has sufficient operating clearance to complete the
opening movements (dimensions C and E). (FIG. 1).
• Referring to fig. 6, drill 4 holes of suitable diameter in relation to the type
of anchor bolts used to fix plate P.
• Comply with the minimum dimension of 150 mm required to avoid
installing the operator too close to the ground. (FIG. 6).
• Drill 2 holes for fixing the articulated bracket S, complying with the value
of dimension A (FIG. 1) and ensuring alignment (dimension 60 mm) with
the operator bracket P shown in (FIG. 6).
• If the areas of fixing are too insubstantial or insufficiently sturdy, they
must be reinforced.
• Bring the gate leaf to the fully closed position (FIG. 7).
• Remove the operator cover by unscrewing the 2 lateral screws elimina
and the central screw located under the release lever (FIG. 8).
• Fix the operator to the bracket with the two nuts and bolts supplied;
(FIG. 9).
• Fix the arm to the articulated bracket using bushing, washer, nut and
bolt (FIG. 10).
• Check that the bracket and arm are perfectly level.
• With the operator released, open the gate leaves completely and check
the operating clearances of the two arms.
• Adjust the limit stop as described in heading 4.4.2.
4.4.2 INSTALLATION OF LIMIT STOPS AND SWITCHES
Mechanical limit stop
The operator is equipped with two adjustable mechanical limit stops that
arrest the gate when the fully open and fully closed positions are reached.
• With the operator released, bring the gate leaf to the desired opening
position (FIG.11).
Содержание CONDOR 220
Страница 3: ...3 COMUNELLO Copyright 2013 All right reserved FIG 4 FIG 5 FIG 3 FIG 6 S P S P ...
Страница 4: ...4 COMUNELLO Copyright 2013 All right reserved FIG 7 FIG 8 FIG 9 FIG 10 ...
Страница 5: ...5 COMUNELLO Copyright 2013 All right reserved FIG 11 FIG 13 FIG 12 FIG 14 1 ...
Страница 6: ...6 COMUNELLO Copyright 2013 All right reserved FIG 15 FIG 16 FIG 18 FIG 19 FIG 17 ...
Страница 7: ...7 COMUNELLO Copyright 2013 All right reserved FIG 20 FIG 22 FIG 24 FIG 23 FIG 21 1 2 3 ...
Страница 12: ...FIG 35 FIG 36 CR220 ONE 24V FM B CR350 ONE 24V FM B 308 236 200 FIG 37 CR220 ONE 24V SC B CR350 ONE 24V SC B ...
Страница 37: ...37 COMUNELLO Copyright 2013 All right reserved NOTES ...
Страница 38: ...NOTES ...
Страница 39: ...39 COMUNELLO Copyright 2013 All right reserved NOTES ...