
assembly). Hint: Do not push Horizontal Ladder tight against the
Upright Ladders. Leave a ½” - 1” gap between the UPright Ladder
Rails and the Horizontal Ladder. This will allow for easier adjustment
of the Horizontal Ladder in the future.
10.
Using two strong adults, stand the assembled Horizontal Ladder
set into the holes.
11.
Install plugs into the ends of the Top Rails.
12.
Slide Top Rails into Top Sleeve of the Upright Ladders (see #2
Ladder to Top Rail assembly). Secure set screws.
13.
Assemble and attach Swing Hangers to Top Rail (see Swing
Hanger assembly sheet).
14.
Attach swing chains, seats, trapeze bar and rings.
15.
Measure the height of the Top Rails to ensure proper swing
height.
16.
Level the swing set.
17.
Attach the Slide onto the Ladder with holes drilled (see Slide
Assembly instruction sheet).
18.
Mix concrete according to package directions and pour the
appropriate quantities into each hole.
19.
Allow cement to cure for 3-5 days and enjoy your Component
Playground!