P M 13 7 9
3
3-2. POSITIONING JUMPER LINKS.
3-1. GUN INSTALLATION
FIGURE 3-1. GUN INSTALLATION
1 MIG GUN OPENING.
2 TRIGGER RECEPTACLE.
3 WIRE FEEDER MECHANISM.
4 LOCKING KNOB.
5 GUN END.
Loosen locking knob and insert gun end through access hole into gun adapter. Tighten locking knob.
6 GUN TRIGGER PLUG.
Insert plug into receptacle, and tighten threated collar.
Check input v oltage av ailable at site.
1.-
Jumper Links Access Door
Open door.
2.-
Jumper Link Label
Check label - only one is on unit.
3.-
Input Voltage Jumper Links
Move jumper links to match input voltage.
Close and secure access door.
DCTP0022
460 VOL TS
230 VOLTS
575 VOLTS
JUMPER LINKS LOCATION
L1
L1
L1
L2
L2
L2
1
2
3
DCT P0 022
46 0 VO L T S
230 VO LT S
5 75 VO LTS
JUMPER LINKS LOCATI ON
L1
L1
L1
L2
L2
L2
SECTION 3 INSTALLATION
3
4
TURN TO TIGHTEN
OR LOOSEN