3-10
Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide
Compaq Confidential – Need to Know Required
Writer: Jennifer Hayward Project: Compaq ProLiant ML350 Generation 2 Server Setup and Installation Guide Comments:
Part Number: 236843-002 File Name: d-ch3 Hardware Options Installation.doc Last Saved On: 9/5/01 12:33 PM
Storage Devices
This section discusses removal and replacement procedures for the storage
devices supported by the ProLiant ML350 Generation 2 server.
Before installing a device, see “Front Panel Components and Drive Bay
Dimensions” in Chapter 1, “Server Features,” for the locations and dimensions
of the server drive bays.
CAUTION:
To prevent damage to equipment or loss of information, make sure
that the server is powered down, all cables are disconnected from the back of
the server, and the power cord is disconnected from the grounded (earthed)
AC outlet before removing the access panel or front bezel.
IMPORTANT:
When you add or remove a component or change a security feature, you
must reconfigure the server to recognize these changes. If the system configuration is
incorrect, your server may not work properly and you may receive error messages on the
screen.
Identifying Guide Screws
When installing drives in the removable media bay, you must install guide
screws to ensure that the drives correctly align in the drive cage. Compaq has
provided extra guide screws. They are located behind the side access panel of
the server. Some options use 5.25 M3 metric screws and some use HD 6-32
screws. The metric screws supplied by Compaq are black.
Figure 3-8. Identifying drive guide screws
NOTE:
The interior of the server may look different depending on the model purchased.