Compaq AlphaServer DS10 Скачать руководство пользователя страница 1

1

        EK–DS10S–RM. A01

A

LPHA

S

ERVER

 DS10

RACKMOUNT GUIDE

Overview

 

Rackmount Guidelines

 

Unpack Rackmount Box

 

Determine Base Zero

 

Mark and Prepare the Rails

 

Install the Rails

 

Attach the Rackmount Ears

 

Insert and Secure the System

 

Check Power and Secure Cables

 

For More Information

WARNING:  To prevent injury, access is
limited to persons who have appropriate
technical training and experience.  Such
persons are expected to understand the
hazards of working within this equipment
and take measures to minimize danger to
themselves or others.

Rackmount Guidelines.

 

A maximum of six systems per each power
controller unit in a rackmount cabinet.

Unpack Rackmount Box

The rackmount box is one of three long boxes found
in the system’s shipping carton (see Figure 1).  It
contains these instructions, two rails, U-clips and
screws, and two rackmount ears for securing the
system in the rack.

Figure 1  Unpacking the Rackmount Kit

PK1038-99

Determine Base Zero

Decide the relative position of the system in the rack.
Base zero is where the bottom of the system will be
when installed in the rack.

If your system is the first system in the rack,

 

then

base zero is between the 6

th

 and 7

th

 hole up from the

floor of the rackmount cabinet.  This distance allows
the system to clear the power controllers and provide
space for cable management.

If you are adding your system to a rack already
populated
, then base zero is the top of the system
underneath the system to be installed.  This system
needs a clearance of 9 holes to accommodate the
system height.

Mark and Prepare the Rails

 

Using the template on the back of this card (

 

Figure 9) mark holes 2 and 5 on an interior rail,
and base zero (see Figure 2).

Figure 2  Using the Template

PK1033-99

2

5

Base 0

Top

 

Mark all four of the inner rails (see Figure 3).

 

If you are installing more than one
AlphaServer DS10 in the rack at the same
time:
 using the template, mark the top of the first
system you are installing.  Use this as base zero
for the second system, move the template up,
mark holes 2 and 5, and the top of this system,
until you have marked holes for all of systems
you are installing.

 

Insert a U-clip at each hole you have marked.

Figure 3  Marking Inner Rails

PK1033a-99

2

5

Отзывы: