![CommScope SYSTIMAX iPatch Panel Скачать руководство пользователя страница 27](http://html.mh-extra.com/html/commscope/systimax-ipatch-panel/systimax-ipatch-panel_managers-manual_2643685027.webp)
Chapter:
Installing the iPatch Equipment
2–11
Task E. For Each Rack with iPatch Panels, Install the Panels
Important:
To use iPatch Fiber Shelves in an existing iPatch System, the iPatch
Manager units (and any Network Managers) must be running a compatible software
version. To determine which software versions are compatible with your iPatch
Fiber Shelves, refer to the installation instructions provided with the shelves. To
obtain the latest version of software, contact your SYSTIMAX Solutions local
account representative.
1
Install the iPatch Panels on the rack. For instructions, see the installation
instructions provided with the panel.
Important:
Make sure that each iPatch Panel is securely connected to the panel
bus. The most common problems that occur with equipment installation are
due to improper panel bus jumper connections at the panel or at the panel bus.
2
For a Panel Manager
, connect the power adapter plug to the PWR1 jack on the
back of the Panel Manager
. Route the power adapter cord along the display
patch cord. Use the strain relief strap to secure the power adapter cord to the
display patch cord.
For a Panel Manager with a Network Manager module installed
, connect the
power adapter plug to the PWR IN1 jack on the
back of the Network Manager
.
Route the power adapter cord along the patch cord connected to the Panel
Manager.
Note:
Remove the strain relief strap from the Panel Manager display patch
cord. It will be used in Task H to provide strain relief for the power adapter cord.
Figure 2–10 Connecting the Power Adapter
Strain relief strap
Power adapter cord
Power adapter cord
Panel Manager
Panel Manager with Network Manager Module