4. Commissioning
MF0123A1F
_FCC
_uc
Manual for PSR 700/800 MHz
Page 23
4.2.3. Connections
figure 4-1 Connectors of PSR 700/800 MHz
* Note:
Whenever they are not used, the measurement probes must be terminated with
the (golden) SMA terminations.
4.2.4. Grounding (Earthing)
Grounding must be carried out. Connect an earth-bonding cable to the grounding bolt
inside the PSR. To get access to the grounding bolt, the front door must be opened by
unlocking both locks at the left side of the cabinet with the supplied key.
The PSR is designed to operate under AC (89-264 VAC), DC (-62 to -34 VDC) / max
load 160W. A Ground wire needs to be connected correctly without removing or
changing the Ground lug of the supply conductors:
figure 4-2 Grounding bolt (left) and schematic view (right)
After loosening the M4 hexagon nut, connect the ring terminal of the earth-bonding cable
to the grounding bolt as illustrated above. Then, fasten all parts again with the M4
hexagon nut. Do not use the grounding connections to connect external devices.
Connector for alarm cable
Connector for coverage antenna
LAN/Ethernet connector
DO NOT
USE
Access for mains con-
nection, e.g. for BBU /
UPS (not part of delivery)
Connector for
donor antenna
Measurement probe
for donor antenna *
Measurement probe *
for coverage antenna
PSU GND cable, pre-
installed by supplier:
Unscrew and remove it;
install the local GND
cable; then connect it
again on top of the local
GND cable.
Local power cable GND, to be connected by installer between
the PSR cabinet and the pre-installed PSU GND cable (which
must be unscrewed first so that it will be located on top).
To
feed
the
grounding cable
into the housing
through
this
opening, remove
the plastic cap.
The
available
1/2”
common
thread can be
used to connect
conduit.