Page 3 of 10
© 2019 CommScope, Inc. All Rights Reserved
6.1.4
Pre-install the 4 cable ties.
6.1.5
Bring in the cables. Secure externally with the hose
clamps, internally with the cable ties. Secure the aramid with
the screw (1 turn around the screw and then tighten). Cut the
excess aramid.
6.1.6
Route the bundle(s) to be spliced to the back of
tray 1 by using the wrap-around slots. With this feature uncut
fibers can be routed and stored in the splicing zone.
6
Splice application
6�1
Feeder cable preparation and
installation
6.1.1
Make a window cut /midspan opening of 1 m/39.37
inches. If aramid is present, cut to a length of 100 mm/4 inches.
6.1.2
Clean the jacket and apply 2 layers of foam: 1
almost flush with the jacket end and 1 at 60 mm/2.36 inches
from the jacket end.
6.1.3
Open the gel block.