6
Loop Plastic with Double-Sided Tape Installation
1
Removing the liner from the double-sided tape
2
Fastening the hanging chain to the S-hook
□
Remove the liner from the tape and place the loop plastic (MM)
on the flush surface. The spacing between should be 35 3/8 in.
□
Insert the S-hook (GG) into the mounting holes located on the back of the solar
shop light (AA). Repeat this step on the opposite end.
IMPORTANT:
Use double-sided tape only on ceilings that are flush and not suitable for drilling screw holes. Be sure ceiling surface is clean.
MM
35 3/8 in.
ceiling
ceiling
MM
MM
GG
FF
GG
□
Attach the second S-hook (GG) onto the loop plastic (MM). Mount the 18 in.
hanging chain (FF) onto both S-hooks (GG). Repeat this step for opposite end.
3
Mounting the hanging chain onto the screw hooks
AA
GG
AA
NOTE:
To achieve strong bond, firmly
apply pressure to the loop plastic for
several seconds. After application, allow
24 hours for the most bond strength.