Step 3
: Using 8 8x20mm CHB’s loosely secure parts 004 to 005
Step 4:
Minimum of two people required
for this step
.
Aligning the control cable of 013 to the inside, secure both columns to the base
structure using 8x 6x25mm bolts.
4off 8x20mm CHB at each
end
4off 6x25mm Hex bolts