40
- Remove the cover and the faston
(A)
on the
probe bulb.
- Use a wrench
ch 13
to loose the probe holder
(B)
and remove the probe rod.
- Remove the Teflon ogive gasket
(C)
. The ogive
gasket is generally deformed to seal the probe
holder and takes the shape of the threaded hole.
To remove the ogive gasket, unscrew it with a
screwdriver and replace it, if needed.
- Carefully clean inside the casing
(C)
and the rod
and refit.
Safety valve check
The safety valves should be checked every six months. For this check, the
chamber 09
should be cold and the
door 16
open.
To ensure proper operations of the
chamber safety valve 12
and of the
generator safety
valve 12A
, remove the cover and unscrew the valve upper plug until it rubs. Pull the plug
upward to open the valve manually. Close the plug.
Door adjustment
In case of leakage:
•
Check and carefully clean the
chamber gasket 31
.
•
Adjust the door closing by following these steps:
-
Switch the sterilizer off and wait for it to cool down, then open the door.
-
Remove the cover from the sterilizer.
-
Rotate the screw on top of the chamber to adjust the hook and thus
adjusting the door closing.
-
Test tightness by starting a new cycle. Repeat the operation if needed.
Note:
Do not tighten the door excessively. Excessive pressure may deform the gasket.
Additional checks and settings
Содержание Sterilclave 6 B Speedy
Страница 2: ...2...
Страница 6: ...6 Graphical reference representation Mod 6 B SPEEDY Contents...
Страница 7: ...7 Contents...
Страница 8: ...8 Contents...
Страница 57: ...57 Diagrams and wirings...
Страница 58: ...58 Wiring diagram 6 B SPEEDY Diagrams and wirings...
Страница 60: ...60 STEAM PEAK diagram EV2 ON EV4 ON Internal coil ON steam is injected in the chamber 09 Diagrams and wirings...