Coil alarm  

This alarm indicates that the coil element circuit is either open or interrupted. 
 

The alarm is displayed on the sterilizer in any condition when the coil circuit is NOT 
detected as closed. 

 
Perform the following checks in the order shown: 

 

Rearm the 

safety thermostat 17 

or

 17A

 by removing the plug and pressing the button 

underneath. The thermostat may be rearmed only if the 

chamber 09

 has cooled down. 

To speed up cooling, open the 

door 16

 which will however be locked. The 

door 16 

can 

be opened by turning the sterilizer on with the 

main switch13

. Press ON to display the 

message CLOSE THE DOOR? YES/NO. Press YES to start the procedure to open the door.

  

 

Check the coils with a tester for continuity without checking the value. 

 

Check TRIAC components of the 

power board 34

 and replace the electronic board 

pair, if required.

 

 

Self-filling alarm  

This alarm is present on models with the 

automatic water inlet 29 

(optional). 

 

The sterilizer will display this message in STAND BY mode only when the automatic water 
inlet is fitted (see USE AND MAINTENANCE MANUAL, chapter CONNECTIONS). 

 

 

In configuration (A)

, fill or replace the distilled or demineralized water tank. 

Note: Constantly running the pump without water will effect durability and drastically 
reduce the component’s life. 

 

Check that the inlet pipe is neither bent nor twisted. 

 

If the problem persists, check if the 

automatic water inlet pump 46 

is working. 

 

 

In configuration (B)

, check that the mains water tap is open and that the mains water 

pressure is higher than the minimum pressure indicated for the installed demineralization 

system. 

 

If the problem persists, check if the solenoid valve 

EV7 

above the water inlet opens 

correctly. 

 

In both cases

, check: 

- that all connections are properly connected; 
- that all pipes are in their seats and neither cracked nor twisted. 
 

 

Door alarm 

This indicates that the 

door 16 

is not correctly closed. 

 

The sterilizer may display this message when an attempt is made to start a cycle but the 
door is not completely locked. The sterilizer will not start in this condition. 

 

 

Close the door properly before starting a cycle. 

 

If the problem persists, despite the door being locked, 

micro-switch M1 36A 

and/or 

micro-switch M2 36B 

are not correctly pressed or are faulty. Check that: 

-

 

the lock nuts on the micro-switches are tight; 

-

 

the pin is not bent, out of its seat, or loose; 

-

 

there is continuity at micro-switch contacts (use a tester); 

-

 

there are no obstructions or dirt near the micro-switch rod; 

-

 

the connection cables between the door and the sterilizer are operating and 
properly connected. 

 

Alarms 

Содержание Sterilclave 6 B Speedy

Страница 1: ...writing by COMINOX Technicians must read this manual and follow the instructions herein contained COMINOX is not liable for any injury and or damage to people or property or to the sterilizer itself s...

Страница 2: ...2...

Страница 3: ...e maintenance 23 Scheduled maintenance table 24 MESSAGES 25 Scheduled maintenance 25 Check water quality 25 Cooling pause 25 Generator warm up 26 ALARMS 27 Insufficient water quality alarm 27 Insuffic...

Страница 4: ...sure rises too slowly 41 Poor drying 41 Steam leakage from the safety valve 41 Vacuum pump servicing procedure 42 Automatic water inlet does not work correctly 43 Printer does not print 43 AUTOMATIC W...

Страница 5: ...18 lower panel 20 drain filter 24 clean water drain tap 26 printer 29 automatic water inlet 30 direct drain 31 chamber gasket 32 fuses 33 logic board 34 power board 35 water inlet pump 36A micro switc...

Страница 6: ...6 Graphical reference representation Mod 6 B SPEEDY Contents...

Страница 7: ...7 Contents...

Страница 8: ...8 Contents...

Страница 9: ...erilCard reader a Technician SterilCard kit may be employed The kit includes a reader a Technician SterilCard and a cable for connecting the reader to the logic board 33 connector J5 In STAND BY mode...

Страница 10: ...probe S4 is not used in 6 B SPEEDY model S5 is the maximum level probe 43B of the steam generator 47 S6 is the minimum level probe 43A of the steam generator 47 S7 is not used PT1 is the temperature p...

Страница 11: ...ump is replaced by the solenoid valve EV7 Vacuum pump is the vacuum pump 41 Door lock Fan s is the fan 42 Aux 1 is not used Aux 2 is not used External coil for pre heating and drying chamber 09 Intern...

Страница 12: ...emperature probe PT1 PT2 and PT3 A specific calibration kit is needed for calibration To calibrate PT1 PT2 or PT3 select option 3 4 or 5 in the Technician Menu respectively To connector CN12 CN13 or C...

Страница 13: ...CN12 for sensor PT1 connector CN13 for sensor PT2 or connector CN14 for sensor PT3 Connect the calibration tool 2 pin cable to the connector CN12 CN13 or CN14 of the power cable 34 Switch pole number...

Страница 14: ...witch the pole number 1 of the temperature selector to OFF and switch pole number 2 of the temperature selector to ON which corresponds to a 1573 Ohm sample coil 150 C Wait for at least 10 seconds and...

Страница 15: ...erature selector to OFF and switch pole number 3 of the temperature selector to ON which corresponds to a 1832 Ohm sample coil 220 C Wait for at least 10 seconds and press ENTER Press to go back to th...

Страница 16: ...TP board calibration This procedure is used to calibrate the pressure transducer Disconnect the connector CN11 corresponding to the pressure transducer from the electronic power board 34 Technician Me...

Страница 17: ...34 Set the calibration tool switch to 0 V position 2 Wait for at least 10 seconds and press ENTER Now set the calibration tool switch to 5 V position 1 Wait for at least 10 seconds and press ENTER Pre...

Страница 18: ...ER to confirm Press to go back to the Technician Menu without changing the calibration PT1 PT2 PT3 correction This procedure is used to correct the temperature value displayed during the sterilization...

Страница 19: ...test cycle is to run the sterilizer continuously for instance at night to test efficacy of the performed maintenance operations Press to enter the number of cycles and press ENTER to confirm Press to...

Страница 20: ...ng changes to the accessory settings Delete maintenance Press YES to delete all maintenance interventions performed on the sterilizer from the machine memory and reset the remaining day and cycle coun...

Страница 21: ...de 1 2 Accessories 3 Correction PT1 These options correspond exactly to those contained in the Technician Menu and described above Main Settings Menu You can access the Main Settings Menu at any time...

Страница 22: ...ins two options 1 Items 2 Save maintenance Items Press ENTER to display the list of items subject to scheduled maintenance The remaining days and cycles and the last three replacements are shown for e...

Страница 23: ...enance log Press NO to go back to the list of items Save maintenance Press ENTER to display the following screen Press No to go back to the Maintenance Menu Press YES to store the maintenance activity...

Страница 24: ...6000 6 years Door gasket 3000 2 years Generator level probes 3000 3 years Fan s 4000 3 years Temperature probe 1 6000 6 years Temperature probe 2 6000 6 years Chamber safety thermostat 6000 6 years Ge...

Страница 25: ...5 S cm but is still acceptable The sterilizer may allow to run one or more cycles but it is advisable to proceed as described in section INSUFFICIENT WATER QUALITY because this alarm could stop operat...

Страница 26: ...p During the warm up of the steam generator 47 you can only start the VACUUM TEST For all other tests the ENTER button is not available When the steam generator 47 reaches the set temperature the mess...

Страница 27: ...tic water inlet 29 is installed see USE AND MAINTENANCE MANUAL chapter CONNECTIONS and Self filling in the Main Settings Menu is ON It indicates that the conductivity of the water provided is no longe...

Страница 28: ...pter DOOR ADJUSTMENT Check correct operation of the pressure transducer 38 and temperature probe PT139 using an appropriate measuring tool Check the internal coil of the steam generator 47 Check that...

Страница 29: ...If the alarm persists there could be a fault in the heating circuit Check that during pressurisation or steam peaks fractioned vacuum the chamber internal coil is correctly powered see wiring diagrams...

Страница 30: ...band This alarm could be generated by incorrect temperature and pressure values If the UNDERTEMPERATURE alarm appears check that the load weight does not exceed the maximum value allowed see USE AND...

Страница 31: ...re setting select option 6 from the Technician Menu Board calibration TP and follow the instructions Replace the transducer if the error between the pressure shown on the display and the pressure indi...

Страница 32: ...ng the pump without water will effect durability and drastically reduce the component s life Check that the inlet pipe is neither bent nor twisted If the problem persists check if the automatic water...

Страница 33: ...m is triggered immediately after starting the cycle the pre closing micro switch is not working micro switch M2 36B if the alarm is triggered 3 minutes after starting the cycle the door lock micro swi...

Страница 34: ...1 Proceed as shown for the FRACTIONED VACUUM ALARM Misalignment alarm This indicates that the temperature in the chamber 09 does not correspond to the theoretic steam temperature The sterilizer displa...

Страница 35: ...alarm was issued the last alarm issued will be displayed On the basis of the message on the display you can infer if the sterilizer managed to complete the sterilization cycle or not despite the power...

Страница 36: ...7 Check the solenoid valve EV4 Generator level alarm This alarm indicates that the time has been exceeded for the correct level of water to be reset in the steam generator 47 The sterilizer displays t...

Страница 37: ...perature probe alarm This is triggered when the temperature probe PT3 39 of the external coil is disconnected or faulty The sterilizer shows this alarm during operation when the sensor PT3 39B on the...

Страница 38: ...UFFICIENT VACUUM 11 FRACTIONED VACUUM 12 13 LEVEL PROBES 14 PRESSURISATION ALARM 15 OVERTEMPERATURE BAND 16 UNDERTEMPERATURE BAND 17 18 POWER MISSING 19 GENERATOR INSUFFICIENT WATER LEVEL 20 PT2 OVERT...

Страница 39: ...referred reading position see chapter DIAGRAMS AND WIRING Electronic logic board Level probe check The level probes of the clean water tank 10 and of the steam generator 47 are metal rods fitted into...

Страница 40: ...To ensure proper operations of the chamber safety valve 12 and of the generator safety valve 12A remove the cover and unscrew the valve upper plug until it rubs Pull the plug upward to open the valve...

Страница 41: ...ed as follows if drying is not satisfactory at the end of the cycle Check that a cycle with drying phase has been selected and that the selected cycle is suitable for the material to be sterilized see...

Страница 42: ...ific kit Remove the pump and carefully check the position of components Check that the membranes are not cracked Clean them or replace them if needed Check the rubber valves Clean them or replace them...

Страница 43: ...figuration B from water mains check that the mains water tap is open If the tap is open and the AUTOMATIC WATER INLET ALARM is on check for flow of water downstream of the installed demineralization s...

Страница 44: ...pes which may have different length and placement Pull out the sterilizer if built in place it in an appropriate position and remove the cover Remove the plugs T from the lower part of the sterilizer...

Страница 45: ...pipes the end of the inlet pipe is cut in a particular manner to prevent a suction effect when it rests on the bottom of the tank The waste pipe is provided with a quick coupling male attachment Test...

Страница 46: ...ion block and warns that it is necessary to change the resins Purification block By treating mains water with a flow of about 650 S cm the purification block B is able to produce 250 liters of water b...

Страница 47: ...bearing the label OUT on the front Use the supplied pipes 2 m each and push them as far as possible into the connections Remove the plugs positioned under the front cover of the bracket Remove the pr...

Страница 48: ...valve EV7 outlet 2 to the clean water tank 10 Insert the probe support E in the silicon pipe and fasten the ends with the pipe clamps provided Connect to the pins using the appropriate screws and read...

Страница 49: ...support Cable 4 self tapping screws 4 spacers 4 M3x6 screws 4 nuts 8 washers Follow these instructions to assemble the SterilCard kit 1 Assemble the SterilCard reader on its support as shown in the p...

Страница 50: ...rd reader and connect end B to the J5 connector of the logic board Reassemble the control panel on SterilClave 4 Turn on the sterilizer and insert the Technician SterilCard In the Technician Menu scro...

Страница 51: ...he sterilizer a specific kit is provided To install the components follow the procedure described below Pull out the sterilizer if built in place it in an appropriate position and remove the cover Uns...

Страница 52: ...nnect the printer cable to connector CN6 on power board 34 In the Technician Menu scroll to Accessories option 16 and set Printer ON Specify the number of copies for the Printer option in the Main Set...

Страница 53: ...ick Identify If the numbers displayed in the box are different from zero the connection has been established correctly otherwise check the number of the COM port and the cable since the connection is...

Страница 54: ...tage board common to all models J1 Connection cable to power board 34 J3 Connection cable to the serial port J5 Connection cable to the SterilCard reader J6 Connection cable to the keyboard PT1 Displa...

Страница 55: ...Printer connector CN7 Level probe connector 1 Ground yellow green 2 Conductivity meter ground blue 3 Probe S7 not used 4 Minimum level probe of the steam generator 47 5 Maximum level probe of the stea...

Страница 56: ...4 16 A F5 10 A F6 0 63 A LEDS DL1 Internal coil on LED DL2 5V power LED DL3 External coil on LED DL4 Coil safety LED on in normal conditions off when a COIL ALARM occurs DL5 Printer power LED DL6 24V...

Страница 57: ...57 Diagrams and wirings...

Страница 58: ...58 Wiring diagram 6 B SPEEDY Diagrams and wirings...

Страница 59: ...Inlet tap EV4 Steam generator solenoid valve SC Inlet tank EV5 Drying solenoid valve 4 5 SD Direct drain EV6 Vacuum pump by pass solenoid valve 4 5 TG Generator thermostat F Air Filter TP Pressure tr...

Страница 60: ...60 STEAM PEAK diagram EV2 ON EV4 ON Internal coil ON steam is injected in the chamber 09 Diagrams and wirings...

Страница 61: ...61 VACUUM PULSE diagram p 1 2 bar Pressure inside the chamber is higher than the atmospheric value Steam flows naturally Diagrams and wirings...

Страница 62: ...62 VACUUM PULSE diagram p 1 2 bar EV3 ON EV6 ON PV ON Steam air removal from the chamber EV2 EV3 cycle introduces air in the pump and removes condesed steam Diagrams and wirings...

Страница 63: ...63 DRYING diagram EV3 ON EV6 ON PV ON EV5 ON Steam removed from the chamber is replaced by filtered air Diagrams and wirings...

Страница 64: ...64 Cominox S r l Via G Vigan 7 20048 Carate B za Mi Italy Tel 39 0362 912312 Fax 39 0362 900940 www cominox it SCG02SPD May 2010 Rights reserved to make changes without notice...