Installation and remove procedure
Smoke generator setup
The assembly and connection instructions, with necessary steps for the preparation of the smoke
generator cartridge, are reported in the manual attached to it.
• Warning! The replacement of the smoke generator also involves the replacement of the
activation circuit.
Assembly
• Fasten the enclosure to the wall with a height of 2.10 to 2.30
meters above the ground
• Connect power and I/O cables.
• Place the dip-switches according to the desired settings.
• Power-up the device (without the smoke cartridge).
• Check the operation by checking the status LED, that will
have to show the following indications:
◦
3 PURPLE blinks (communication error due to lack of
smoke cartridge)
◦
1 BLUE blink (Test and Maintenance mode)
◦
1 GREEN blink (Regular status of inputs)
◦
1 BLUE blink (Test and Maintenance mode)
• Connect the smoke generator cartridge, and place it in
position.
• Check the status of the smoke generator (3 GREEN blinks, to
indicate the REGULAR status).
• Close the lid with the screws provided.
• Insert the screw cover band.
• Wait the exit from the TEST and MAINTENANCE mode with
the stop of BLUE LED blinking.
• The smoke generator is ready to use.
Removal
Follow the operations necessary to ensure that the sabotage of
the device does not lead to the activation of the same (for example
putting the connected control unit in maintenance)
• Open the container
• Turn the SW-7 switch to ON by activating the flashing of the LEDs
• Press the RESET key or wait for the device to enter “TEST and MAINTENANCE” mode (BLUE
LED flashing)
• Disconnect the device
• From now on you can safely remove the device or replace the capsule
WARNING! Do not disconnect the device before putting it in “TEST and MAINTENANCE”
mode. The device has an autonomy of operation even in the absence of power supply.
Disconnecting it before putting it into maintenance can lead to activation of the same.