![ComAp InteliMains NT IM-NT Скачать руководство пользователя страница 280](http://html1.mh-extra.com/html/comap/intelimains-nt-im-nt/intelimains-nt-im-nt_reference-manual_2638901280.webp)
InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf,
©ComAp – April 2015
280
11.2.13.20
Setpoint: Ld reconDelay1
Group
Load shedding
Range [units]
0 .. 600 [s]
Related FW
standard v3.1.0
Force value
possible
YES
Description
This setpoint is used to adjust time period for load shedding stage1, that the
must be below the
of next load group.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
11.2.13.21
Setpoint: Ld reconDelay2
Group
Load shedding
Range [units]
0 .. 600 [s]
Related FW
standard v3.1.0
Force value
possible
YES
Description
This setpoint is used to adjust time period for the load shedding stage 2, that
the
reconnection of next load group.
N
OTE
:
Learn more about load shedding in the separate chapter
Load shedding
.
11.2.13.22
Setpoint: Ld reconDelay3
Group
Load shedding
Range [units]
0 .. 600 [s]
Related FW
standard v3.1.0
Force value
possible
YES
Содержание InteliMains NT IM-NT
Страница 150: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 150 APPENDIX...
Страница 435: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 435 16 User Notes...
Страница 436: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 436...
Страница 437: ...InteliMains NT SW version 3 2 0 InteliMains NT MCB MGCB 3 2 0 Reference Guide pdf ComAp April 2015 437...