Page | 27
VASTRAJET
Stages of Glue (Adhesive) Process
Stage 1:
Prima coat
Stage 2:
Therma coat
Stage 3:
Perma coat
An interval of 4hrs is required for the glue to set and dry. After each glue coat, run the glue cycle for 50
minutes with glue heater ON. After final coat of Perma, printing can be started. The third stage is generally
a repetitive process, repetition depending on the frequency of printing hours. And when the glue coats get
uneven or once in 2-3 months, whole process has to be repeated after removing existing Glue layers.
Note
: Average consumption for the Cleantek solvent is 500ml for one time.
Approximate consumption of chemicals for a year:
•
Prima :
Approx. 2 Ltrs
•
Therma:
Approx. 2 Ltrs
•
Perma:
Approx. 5 Ltrs
•
Cleantek:
Approx. 4 Ltrs
•
Solvtek :
Approx. 10 Ltrs
Note
: Actual consumption depends on the work load, fabric type, and the maintenance. Generally, shelf life
for these chemicals is approx. 4 years.
Glue Process Preparation
Follow these steps for glue process preparation:
Step 1:
Keep the
ventilators
and
exhaust
fans ready.
Step 2:
Lift up the
Press Roller
and remove the fabric, if any.
Fig 21: Pressing Rollers