Section 6
Maintenance
Issue: A Revision: 1 Date: 24/07/19 Ref: 100606
Page: 123
Some instrument components/operation can be verified as follows :
Conduct the procedure for changing the heater cartridge within the transmitter,
(see Replacement of the Heater Element), up to operation 4. Remove one
lead from the heater cartridge and measure the resistance across the two
cartridge terminals. It should be about 3.5
. If it is open circuit the heater
cartridge needs replacing.
Conduct the procedure for adjusting the chopper frequency in the transmitter,
(see
6.5.1
Individual Tests
Heater Cartridge
6.5.1.1
Chopper Motor
6.5.1.2
Содержание Energy Tech 401
Страница 71: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 71 ...
Страница 99: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 99 ...
Страница 101: ...Section 5 Normal Operation Issue A Revision 1 Date 24 07 19 Ref 100606 Page 101 ...
Страница 115: ...Section 6 Maintenance Issue A Revision 1 Date 24 07 19 Ref 100606 Page 115 Corrective Maintenance ...
Страница 118: ...Page 118 EnergyTech 401 CODEL Operating and Maintenance Manual Monitoring Solutions ...