98-175666-C
5-1
Chapter 5
Installation check lists
5
Use the following sections to verify that the system is ready for customer delivery.
5.1 Installation check list: Antenna
Step
Task
Further information
Done
1.
Check that the antenna is free of
obstructions.
See
2.
Make sure there is sufficient space for
access through the service hatch.
See
3.
Make sure to maintain the vertical
orientation of the ADU center line.
4.
Check that the ADU is installed where
vibrations are limited to a minimum.
5.
Check that you programmed the blocking
zones correctly.
See
and
6.
Check that the safety distance for
radiation hazard is obeyed.
See
7.
Check that the mounting height of the
antenna is in accordance with the shipʼs
min. roll period.
See
Ship motion and offset from the
8.
Make sure that the requirements for mast
foundation and height, including flatness,
gusset plates and distance from welding
seams are met.
See
9.
Make sure that the distances to radar,
Inmarsat systems, GPS receivers and
other transmitters are as required.
See
Table 5-1: Installation check list: Antenna