Installation of the ADU
98-150471-A02
Chapter 3: Installation
3-21
Installation
3.3.2
To open and remove the service hatch
Open the hatch to access the antenna modules. The two latches of the service hatch must
be locked by fastening the two screws in the latches with a Torx TX20 screw driver to
protect the ADU modules against unauthorised access.
You can remove the hatch for better mobility when servicing the antenna. Do as follows to
open and remove the service hatch:
1. With a Torx TX20 screw driver, remove the two screws locking the latches.
2. Pull open the two latches and let the lid fall open.
3. Remove the 2 split pins and park them.
4. Pull the service hatch free.
Figure 3-19: Opening the service hatch
Figure 3-20: Removing the 2 split pins
Open with TORX TX20.
SAILOR900HP.book Page 21 Monday, July 18, 2016 12:44 PM
Содержание SAILOR 900
Страница 1: ...SAILOR 900 VSAT High Power Installation manual...
Страница 141: ...Appendices SAILOR900HP book Page 1 Monday July 18 2016 12 44 PM...
Страница 142: ...SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 194: ...Linkway S2 modem C 36 Appendix C VMU settings 98 150471 A02 SAILOR900HP book Page 36 Monday July 18 2016 12 44 PM...
Страница 208: ...E 4 Appendix E DVB S satellites 98 150471 A02 SAILOR900HP book Page 4 Monday July 18 2016 12 44 PM...
Страница 232: ...CE R TTE H 2 Appendix H Approvals 98 150471 A02 SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 245: ...98 150471 A02 www cobham com satcom...