Installation of the ADU
98-150471-A02
Chapter 3: Installation
3-19
Installation
5. Attach 2 tag lines of suitable length to 2 lifting brackets and man them.
6. With a crane lift the ADU off the wooden platform and move it on top of the ADU mast.
7. Install the ADU on the mast flange with 4 M12 bolts and washers. Read carefully and
follow instructions given in
Tightening torque value: 30 Nm.
8. Remove the 4 lifting brackets. For safekeeping fasten the lifting brackets inside the
bottom of the radome.
Put the coaxial ADU cable through the protection plate as shown in the following figure
and select a suitable size for the cable gland: 16—20 mm diameter or 19–23 mm
Figure 3-16: ADU installation, webbed sling attached to the 4 lifting brackets
Figure 3-17: Mounting the ADU on the mast flange
SAILOR900HP.book Page 19 Monday, July 18, 2016 12:44 PM
Содержание SAILOR 900
Страница 1: ...SAILOR 900 VSAT High Power Installation manual...
Страница 141: ...Appendices SAILOR900HP book Page 1 Monday July 18 2016 12 44 PM...
Страница 142: ...SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 194: ...Linkway S2 modem C 36 Appendix C VMU settings 98 150471 A02 SAILOR900HP book Page 36 Monday July 18 2016 12 44 PM...
Страница 208: ...E 4 Appendix E DVB S satellites 98 150471 A02 SAILOR900HP book Page 4 Monday July 18 2016 12 44 PM...
Страница 232: ...CE R TTE H 2 Appendix H Approvals 98 150471 A02 SAILOR900HP book Page 2 Monday July 18 2016 12 44 PM...
Страница 245: ...98 150471 A02 www cobham com satcom...