16
Engine Installation
S27 FE 350 ENGINE
1
3
M
F
34
81
533
Figure 16-13
Fan and Flywheel Installation
IGNITION COIL INSPECTION AND REPAIR
See Ignition Coil, Section 11, Page 11-23.
IGNITION COIL INSTALLATION
1.
Installation is the reverse of removal.
2.
While tightening the two bolts (6), use a bronze feeler gauge to adjust the ignition coil air gap to 0.012 inch
(0.304 mm)
.
3.
Tighten the two ignition coil bolts to 30 in-lb (3.4 N·m).
CRANKCASE COVER INSTALLATION
See Crankcase Cover Installation on page 15-6.
ENGINE INSTALLATION
See General Warning on page 1-1.
1.
Place engine onto engine mounting plate and tighten the mounting hardware (1, 2 and 5) to 13 ft-lb (17.7 N·m).
Tighten nuts (6) to 17 ft-lb (23.1 N·m)
.
2.
Install drive clutch.
See Drive Clutch Installation on page 21-11.
3.
Install drive belt.
See Drive Belt Installation on page 21-3.
4.
Install muffler.
See Muffler Installation on page 19-1.
5.
Install starter/generator and belt.
See Starter/Generator Installation on page 13-10.
6.
Install the powertrain.
See Unitized Transaxle Installation on page 20-14.
7.
Install oil drain plug in the crankcase and tighten to 20 ft-lb (27.1 N·m). Apply a light film of oil on the seal of
a new oil filter and install the filter on the crankcase. Fill the crankcase to the proper level with the correct
Page 16-10
2007-2009 Turf 252, Carryall 252 and XRT 900 Maintenance and Service Manual
Содержание CARRYALL 252 2007
Страница 2: ......
Страница 4: ......
Страница 42: ......
Страница 100: ......
Страница 112: ......
Страница 202: ......
Страница 290: ......
Страница 330: ......
Страница 458: ......
Страница 476: ......
Страница 490: ......
Страница 506: ......
Страница 518: ......
Страница 524: ......
Страница 533: ......
Страница 535: ......
Страница 536: ......