
182
5. Job allocation
The selected welding parameters are determined as so-called "jobs" and
saved in the welding power sources. The determination in jobs allows to
change them at will.
It is recommended to assign the job numbers according to a previously
fixed definition. Thus the correct allocation of the welding power source is
clearer and can be ensured easier.
Save a new job in the case of changed adjustments of the operating mode
or the welding process.
Touch the key with the shown symbol on the operating module.
You enter the "Save job" menu.
In this case please note the following:
• When the pulse synchronisation is used together with the Tandem
process, the same job number is automatically invoked in the welding
power sources. The master welding power source ensures that jobs
with the same number are activated in both welding power sources.
• If the pulse synchronisation is used in connection with two or more
individual processes, a corresponding job has to be called in the weld-
ing power sources.
The following scenarios can be realised using the examples below:
• "Tandem mode" with two synchronised pulsed arcs and different
capacities
The seam tracking signal and the synchronisation are automatically
switched when selecting the corresponding job, here 101…103 or 201…203.
The welding power source with the leading wire "tracks" and is the pulse
generator.
INFO!
INFO!
Job
number
Wire in
front
Wire in
the back
Operating
mode Tandem
"Seam track-
ing signal"
"Synergy variant"
"Pulse synchronisation"
"Process"
"Master"
"Slave"
"Master"
"Slave"
101
M
S
"Tandem"
M
leading
following
Pulse
generator
Pulse receiver
alternating
S-Pulse
102
M
S
"Tandem"
M
leading
following
async.
async.
S-Pulse
103
M
S
"Tandem"
M
leading
following
async.
async.
Normal
201
S
M
"Tandem"
S
following
leading
Pulse receiver
alternating
Pulse
generator
S-Pulse
202
S
M
"Tandem"
S
following
leading
async.
async.
S-Pulse
203
S
M
"Tandem"
S
following
leading
async.
async.
Normal
Содержание QINEO
Страница 4: ......
Страница 10: ......
Страница 11: ...11 Operational safety Block 1 Operational Safety...
Страница 29: ...29 Block 2 Basic information Qineo Champ Pro...
Страница 42: ...CHAMP Pro 42...
Страница 109: ...109 Block 4 Additional information...
Страница 124: ...124 SD module...
Страница 138: ...138 Commissioning 6 7 8 5...
Страница 140: ...140 Commissioning 7 5 6 The wire inlet must not touch the wire drive roller INFO...
Страница 145: ...145 Block 6a Error messages...
Страница 159: ...159 Block 6b General maintenance instructions...
Страница 160: ...160 1 Maintenance and Care 1 7 6 4 5 2 3 8 11 9 10 Optional external cooling unit 10 Optional crane suspension 3...
Страница 164: ...164...
Страница 165: ...165 Block 7 Automation...
Страница 184: ...184...
Страница 185: ...185...
Страница 186: ...www qineo de...