P/N 80679, Rev. 10
Page 7
1.6
R
ISK
ASSESSMENT
CHECKLIST
The following checklist is not intended to be an all inclusive list of things to watch
out for when setting up and operating this Portable Machine Tool. However these
checklists are typical of the types of risks the assembler and operator should be
considering. Use these checklists as part of your risk assessment:
T
ABLE
1-2. R
ISK
ASSESSMENT
CHECKLIST
BEFORE
SET
-
UP
Before Set-up
I took note of all the warning labels on the machine.
I removed or mitigated all identified risks (such as tripping, cutting, crushing,
entanglement, shearing, or falling objects).
I considered the need for personnel safety guarding and installed any necessary
guards.
I read the Machine Assembly instructions (Section 3) and took inventory of all the
items required but not supplied (Section 1.9)..
I created a lift plan, including identifying the proper rigging, for each of the setup
lifts required during the setup of the support structure and machine.
I located the fall paths involved in lifting and rigging operations. I have taken pre-
cautions to keep workers away from the identified fall path.
I considered how this machine operates and identified the best placement for the
controls, cabling, and the operator.
I evaluated and mitigated any other potential risks specific to my work area.
T
ABLE
1-3. R
ISK
ASSESSMENT
CHECKLIST
AFTER
SET
-
UP
After Set-up
I checked that the machine is safely installed (according to Section 3) and the
potential fall path is clear. If the machine is installed at an elevated position, I
checked that the machine is safeguarded against falling.
I identified all possible pinch points, such as those caused by rotating parts, and
informed the affected personnel.
I planned for containment of any chips or swarf produced by the machine.
I followed the required Maintenance Intervals (Section 5.2) with the recommended
lubricants (Section 5.4).
I checked that all affected personnel have the recommended personal protective
equipment, as well as any site-required or regulatory equipment.
I checked that all affected personnel understand the danger zone and are clear of
it.
I evaluated and mitigated any other potential risks specific to my work area.
Содержание FF6300
Страница 2: ......
Страница 4: ...Page B FF6300 Operating Manual CLIMAX GLOBAL LOCATIONS...
Страница 5: ...P N 80679 Rev 10 Page C CE DOCUMENTATION...
Страница 10: ...Page iv FF6300 Operating Manual This page intentionally left blank...
Страница 14: ...Page viii FF6300 Operating Manual This page intentionally left blank...
Страница 16: ...Page x FF6300 Operating Manual This page intentionally left blank...
Страница 21: ...P N 80679 Rev 10 Page 5 This page intentionally left blank...
Страница 28: ...Page 12 FF6300 Operating Manual This page intentionally left blank...
Страница 31: ...P N 80679 Rev 10 Page 15 2 1 1 ID chuck assembly FIGURE 2 1 ID CHUCK ASSEMBLY...
Страница 32: ...Page 16 FF6300 Operating Manual 2 1 2 ID chuck assembly dimensions FIGURE 2 2 ID CHUCK ASSEMBLY DIMENSIONS...
Страница 33: ...P N 80679 Rev 10 Page 17 2 1 3 OD mount assembly FIGURE 2 3 OD MOUNT ASSEMBLY...
Страница 34: ...Page 18 FF6300 Operating Manual 2 1 4 OD mount assembly dimensions FIGURE 2 4 OD MOUNT ASSEMBLY DIMENSIONS...
Страница 40: ...Page 24 FF6300 Operating Manual This page intentionally left blank...
Страница 71: ...P N 80679 Rev 10 Page 55 FIGURE 3 44 BACKFACING ATTACHMENT DIMENSIONS...
Страница 72: ...Page 56 FF6300 Operating Manual This page intentionally left blank...
Страница 88: ...Page 72 FF6300 Operating Manual This page intentionally left blank...
Страница 90: ...Page 74 FF6300 Operating Manual FIGURE 6 1 FF6300 IN CONTAINERS STEEL CONTAINER WOODEN CRATE...
Страница 92: ...Page 76 FF6300 Operating Manual FIGURE 6 3 PACKING THE FF6300 WITH OD MOUNT...
Страница 94: ...Page 78 FF6300 Operating Manual This page intentionally left blank...
Страница 99: ...P N 80679 Rev 10 Page 83 This page intentionally left blank...
Страница 126: ...Page 110 FF6300 Operating Manual This page intentionally left blank...
Страница 128: ...Page 112 FF6300 Operating Manual FIGURE B 3 HYDRAULIC KIT 6 2 CUBIC IN MOTOR WITH QD FTG FF6300 P N 80970 HPU HYD MOTOR...
Страница 129: ...P N 80679 Rev 10 Page 113 APPENDIX C SDS Contact CLIMAX for the current Safety Data Sheets...
Страница 130: ...Page 114 FF6300 Operating Manual This page intentionally left blank...
Страница 131: ......
Страница 132: ......