Unit Connections and Service Clearances 20-30 Tons
TOV 20-30 Tons
Notes:
1. Primary Service Side Access
require 3’ - 0” clearance due to electrical panel.
2. Left Service Side Access:
Requires 3’-0” access clearance for service and fi lter access. The unit shown
above is standard Left Hand Access. A unit that is Right Hand Access will mirror the left hand access
shown above.
Utility
Location
Electrical Access
Primary Service Side
Service Access
Primary Side & Left Side
Filter Access
Left Side
Water Cooled
Piping Connection(s)
Left (See Drawing)
Condensate Drain
Left Side