background image

Multi-Appliance Touch Pad 

 

 
 

 
 

Multiple Unit Setup 

CODE / ZONE ALLOCATION OF ADDITIONAL UNITS 

Step 1 

Turn the power on to the next 
appliance being coded.  Check 
the green LED is visible.  

Step 2

 

Press and hold the RESET 
button in the control box (EAC) 
or on the control board (Gas 
Central Heating) for 25 seconds. 

 

At the 25 second mark, the 
green LED will start to flicker.  
Do not release the button at this 
point.  

Step 3

 

The LEDs will now be flickering 
in sequence 1 through to 4 
flickers for EAC and 1 through to 
8 flickers for central heating with 
a pause in between each set of 
flickers.  To allocate the unit to 
the correct code / zone, release 
the reset button immediately 
after the required number of 
flickers has completed.  

See the tables below for the number of flickers to allocate a unit.

 

Step 4

 

Move to the next unit and perform the same procedure as in Step 2 and 
Step 3, to allocate a code number to each unit. Once the unit is coded, 
the power can remain turned on to the unit. 

Each unit can be assigned to a different code number for 
switching through the zone control panel OR each unit can 
be assigned to the same unit allocation number for a non 
zoned (single) switching operation. 

Step 5

 

Once all the units have been assigned an allocation / code 
number, a forced scan at the touchpad control will need to 
conducted so the touchpad can find all the units.

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

Gas Central Heaters. 

LED 

Flickers 

Unit 

Code 

Unit Allocation Code 

0021 H01 

 

0022 H02 

0023 H03 

0024 H04 

0025 

HC01 (with add on cooling) 

0026 

HC02 (with add on cooling) 

0027 

HC03 (with add on cooling) 

0028 

HC04 (with add on cooling) 

 

Evaporative Air Conditioners 

LED 

Flickers 

Unit 

Code 

Unit Identification 
Code 

0017 E01 

0018 E02 

0019 E03 

0020 E04 

 

Evaporative Cooler 

Board 

Central Heater 

Board 

Отзывы: