After Power ON, the Status LED on a Clevertest Plus enabled fitting will display a rapid Green or Red
flashing for a period up to 2 minutes.
4HR:
CTP will only test for the 2 hours (first test) and 90 minutes duration. 4 hours testing would only be
facilitated as a Manual Discharge Test.
Zoneworks, HIVE (HV/HVG) and DATA Monitored Options
Fittings with part numbers -ZW
, -HV, -HVG, -DATA
are fitted with Zoneworks communications modules
(nodes). These fittings are monitored using either Powerline Carrier Technology that utilize the power
cable to provide data communication, RF transceiver modules operating in the ISM band or a dedicated
data cable to/from data routers installed on a dedicated data trunk connected to a central Server (can also
be connected via Ethernet/Internet/Fibre). Zoneworks software on the server is used to monitor,
coordinate testing and collate test data from each fitting. Zoneworks Fittings can be commissioned by a
single push of the test switch or by scanning the supplied barcode. The LED Test Switch indicator provides
a multifunction indication of the status of the fitting during testing and normal operation:
Option
State
LED Operation
ZW, HV, HVG,
DATA
Commissioned
LED on Solid (Green)
ZW, DATA
Un-commissioned
Batt plugged-in:
yellow 1s, green 1s
Batt unplugged:
red 1s, off 1s
HV, HVG
Un-commissioned
With network connectivity
Batt plugged-in:
yellow 1s, green 1s
Batt unplugged:
red 1s, off 1s
HV, HVG
Un-commissioned
Without network connectivity
Batt plugged-in:
yellow 250mS, green 250mS,
yellow 250mS, green 250mS, green 1s
Batt unplugged:
red 250mS, off 250mS, red
250mS,off 250mS, off 1s
ZW, DATA
Emergency Light Test In Progress
LED flashes at yellow 5s , 0ff 1s
HV, HVG
Emergency Light Test In Progress
LED flashes at yellow 1s , 0ff 1s
In the case of the DATA version a 2-way
“figure 8” cable and terminal block facilitates the connection to
the DATA network via a multi-drop bus (daisy chain connection). For further information of installation of
a Zoneworks system, please refer to the Zoneworks Users Guide and Commissioning Guide (incl. DATA
version).
DALI EM Option
Cleverfits with part numbers -DALI are fitted with DALI modules (nodes) that facilitate connection and
integration to 3rd Party Lighting Control Systems. Before installing the fitting please confirm that the
Lighting Control System has the capability to monitor DALI Emergency Luminaires. The fitting will be
addressed and configured into the control system by the Lighting Control System Commissioning
Technicians and not Clevertronics.
State
LED Operation
Commissioned/ Un-commissioned
LED on Solid (Green)
Emergency Light Test in progress
LED flashes at 1s On (Yellow) & 1s Off
“IDENTIFY COMMAND”
Lamp and Status LED Flash for 30 seconds
A 2-
way “figure 8” cable and terminal block facilitates the connection to the DALI network. DALI
connections are marked as Da Da.
LP™ Cleverfit LED Exit
Installation & Maintenance Instruction Leaflet
Victoria (Head Office & Manufacturing)
Website
:
Phone
: +61 3 9559 2700
Fax
: +61 3 9559 2799
New South Wales
Phone
: +61 2 8805 6400
Fax
: +61 2 8805 6444
Queensland
Phone
: +61 7 3442 9700
Fax
: +61 7 3442 9777
South Australia/Northern Territory
Phone
: +61 8 8301 8800
Fax
: +61 8 8351 8286
Western Australia
Phone
: +61 8 9207 0000
Fax
: +61 8 9207 0088
New Zealand
Phone
: +64 800 548 448
Designed in Australia to comply with the
requirements of AS2293.3: 2005 and AS/NZS
CISPR15: 2017
NOTE: Standard product codes with this symbol are
enabled with Clevertest Plus capability. Please refer to
the operation guide supplied with the product for details.
Models:
CCFLED-xx-vv-ss-zz CleverFit Exit
CCFLED-TH-xx-yy-zz CleverFit Theatre Exit
Testing:
Options:
Manual Test
xx = Blank
4 Hour Runtime
zz= 4HR
Zoneworks
xx = ZW
Black in Colour
ss = BLK
Z/W DATA
xx = DATA
Running Man
yy = R
Zoneworks HIVE
xx = HV/HVG
Running Man Left Arrow
yy = RL
DALI Registered.
xx = DALI
Running Man Right Arrow
yy = RR
Clevertest
xx = CT
Double sided DS Running Man
yy = DS-R
Double sided Running Man Arrow
yy = DS-RAOW
Exit
yy = E
Tamperproof
vv =TP
(NOTE: -CT Products supplied with the Clevertest Plus Symbol are activated with Clevertest
PLUS capability. Please refer to the operation guide supplied with the product for details).
Spare Parts:
1550105
BATT:LP 3.2V 1100mAh 260mm lead,no BRKT.
1550090
BATT: LP 3.2V 3200mAh 390mm lead, noBRKT (-4HR)
8002710
PCA:DurisLED Strip Clvrft Pro CT10276-D3
8002329
PCA:CCFLED Driver CT10164-L6 6C43 (-DALI, -HV)
8002348
PCA:CCFLED Driver CT10164-L6 6C43 (CTP, -ZW)
Important:
It is illegal for anyone, except for a licensed electrician to install or maintain this product. Before
installation, ensure that the electricity supply has been switched off and isolated. Installation must be
carried out in accordance with the relevant Australian and International Standards.