Section 4 — Commissioning
Part No. 750-363
4-17
4.10.9 High Air Pressure Switch Settings
The High Air Pressure Switch (HAPS) is used to safely shut down the boiler in case of a blocked flue or
blocked condensate condition. The HAPS has a manual reset, similar to the High/Low gas pressure
switches.
Table 4-2 HAPS Settings
Note:
In the event of a HAPS lockout, investigate possible causes before attempting to restart boiler.
4.10.10 Limit Controls Check
The Modulation Off (operating limit) and High Limit functions can be tested while the boiler is operating by
adjusting the respective setting downward and allowing the boiler outlet temperature to rise. The
Modulation Off point is the sum of the Modulating setpoint and the Hysteresis Off value. The Modulation
On point is the setpoint minus the Hysteresis On value.
When the boiler’s outlet temperature exceeds either of these settings, the boiler will shut down. When the
operating limit is exceeded, the boiler will automatically recycle upon the outlet temperature dropping below
the on point. When the High Limit is exceeded, a lockout should result requiring a manual reset of the
control after the temperature has dropped below the high limit setting.
Before testing the High Limit, temporarily set the Modulation OFF point higher than the High Limit setting.
Restore Modulation OFF and High Limit to operational settings after testing.
Specific settings are determined by application. Maximum High Limit for Model CFLC is 250 deg F.
The High Limit setting is considered a safety parameter. Any changes made will require a password login
and reset of the Falcon.
4.11 POST START-UP CHECKOUT PROCEDURE
1.
Ensure proper air venting to expansion tank.
2.
Set high gas pressure switch to 50% higher than operating gas pressure at low fire. Set low gas pressure switch to
50% lower than operating gas pressure at low fire.
3.
Check the draft on the outlet stack on each boiler, compare to acceptable limits (-.25 to +.25” W.C.) and record in
start up form. Operating outside of acceptable limits could result in light off and flame failure problems.
4.
Switch to automatic operation and monitor flue gas to ensure consistent excess air.
5.
Reassemble all panels and covers that were removed and replace any plugs that were removed to check gas
pressure.
6.
Verify HAPS switch operation by simulating a blocked flue condition.
7.
Verify gas pressures remain within limits shown in Table 4-1.
8.
Provide instructions to owner and operators on operation, safety and maintenance of the equipment.
9.
Provide instructions to owner and operators on proper water treatment guidelines and procedures.
Boiler Size
Setting (inches WC)
20 ppm
9 ppm
4000
5
5
5000
6
7
6000
11
16
8000
21
21
10000
15
8
12000
9
9
Содержание ClearFire CFLC Series
Страница 6: ...vi...
Страница 14: ...Section 1 Introduction 1 8 Part No 750 363...
Страница 16: ...Section 2 Installation 2 2 Part No 750 363...
Страница 36: ...Section 2 Installation 2 22 Part No 750 363 Figure 2 13 Electrical Connections CFLC FALCON...
Страница 38: ...Section 2 Installation 2 24 Part No 750 363...
Страница 56: ...Section 3 Stack and Intake Vent Sizing and Installation 3 18 Part No 750 363...
Страница 87: ...Section 6 Parts Part No 750 363 6 3 Figure 6 1 Boiler Mechanical Assembly CFLC 4000 5000...
Страница 88: ...Section 6 Parts 6 4 Part No 750 363 Figure 6 2 Boiler Mechanical Assembly CFLC 6000 8000...
Страница 90: ...Section 6 Parts 6 6 Part No 750 363 Figure 6 4 Burner Assembly CFLC 4000 5000 UV SCANNER SEE FIGURE 6 7...
Страница 91: ...Section 6 Parts Part No 750 363 6 7 Figure 6 5 Burner Assembly CFLC 6000 8000 UV SCANNER SEE FIGURE 6 7...
Страница 95: ...Section 6 Parts Part No 750 363 6 11 Figure 6 10 Gas Train CFLC 6000 8000 optional 9 PPM NOx...
Страница 97: ...Section 6 Parts Part No 750 363 6 13 Figure 6 12 Gas train CFLC 10000 12000 optional 9 PPM NOx...
Страница 98: ...Section 6 Parts 6 14 Part No 750 363 Figure 6 13 Gas Train CFLC 4000 5000 Propane...
Страница 99: ...Section 6 Parts Part No 750 363 6 15 Figure 6 14 Gas Train CFLC 6000 8000 Propane...
Страница 100: ...Section 6 Parts 6 16 Part No 750 363 Figure 6 15 Gas Train CFLC 10000 12000 Propane...
Страница 105: ...Section 6 Parts Part No 750 363 6 21 Figure 6 20 Control Panel...
Страница 106: ...Section 6 Parts 6 22 Part No 750 363 Figure 6 21 Cables and Cable Harness...
Страница 108: ...Section 6 Parts 6 24 Part No 750 363 Figure 6 23 Casing Insulation 4000 5000 cont d...
Страница 109: ...Section 6 Parts Part No 750 363 6 25 Figure 6 24 Casing Insulation 6000 8000...
Страница 110: ...Section 6 Parts 6 26 Part No 750 363 Figure 6 25 Casing Insulation 6000 8000 cont d...
Страница 115: ...APPENDIX A Falcon Parameters...
Страница 116: ......
Страница 123: ...APPENDIX B Variable Speed Drive Parameters Sections B 1 B 5 PowerFlex 400 Sections B 6 B 8 PowerFlex 525...
Страница 124: ......
Страница 144: ......
Страница 145: ...APPENDIX C Gas Valve Page C 3 Siemens Gas Valve Page C 25 Dungs Gas Valve CFLC 4000 5000...
Страница 146: ......
Страница 147: ...Appendix C Gas Valve C 3...
Страница 148: ...Gas Valve Appendix C C 4...
Страница 149: ...Appendix C Gas Valve C 5...
Страница 150: ...Gas Valve Appendix C C 6...
Страница 151: ...Appendix C Gas Valve C 7...
Страница 152: ...Gas Valve Appendix C C 8...
Страница 153: ...Appendix C Gas Valve C 9...
Страница 154: ...Gas Valve Appendix C C 10...
Страница 155: ...Appendix C Gas Valve C 11...
Страница 156: ...Gas Valve Appendix C C 12...
Страница 157: ...Appendix C Gas Valve C 13...
Страница 158: ...Gas Valve Appendix C C 14...
Страница 159: ...Appendix C Gas Valve C 15...
Страница 160: ...Gas Valve Appendix C C 16...
Страница 161: ...Appendix C Gas Valve C 17...
Страница 162: ...Gas Valve Appendix C C 18...
Страница 163: ...Appendix C Gas Valve C 19...
Страница 164: ...Gas Valve Appendix C C 20...
Страница 165: ...Appendix C Gas Valve C 21...
Страница 166: ...Gas Valve Appendix C C 22...
Страница 167: ...Appendix C Gas Valve C 23...
Страница 168: ...Appendix C Gas Valve C 24...
Страница 186: ...Appendix C Gas Valve C 42...
Страница 187: ...APPENDIX D Falcon Alert Hold and Lockout Codes...
Страница 188: ......
Страница 208: ......
Страница 210: ......
Страница 230: ...Falcon Lead Lag Appendix E E 22 Figure 10 Falcon Lead Lag with outdoor reset and EMS for remote enable...
Страница 231: ...Appendix E Falcon Lead Lag E 23 Figure 11 Falcon LL with EMS for remote enable remote setpoint...
Страница 232: ...Falcon Lead Lag Appendix E E 24 Figure 12 Falcon Lead Lag with EMS for remote comms monitoring...
Страница 244: ...Falcon Lead Lag Appendix E E 36 13 Boiler Wiring Diagrams Model CFC ClearFire condensing boiler...
Страница 245: ...Appendix E Falcon Lead Lag E 37 Model CFW ClearFire hydronic boiler...
Страница 282: ......
Страница 283: ...APPENDIX F Falcon Program Module...
Страница 284: ......
Страница 285: ...Appendix F Program Module F 3...
Страница 286: ...Program Module Appendix F F 4...
Страница 287: ...Appendix F Program Module F 5...
Страница 288: ...Program Module Appendix F F 6...
Страница 289: ......
Страница 290: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...