CLEARSPAN
™
MAJESTIC GREENHOUSES
62
Revision date: 06.21.16
CONNECTIONS- CABLES
Customer-Supplied Baseboard
1
4
3
2
CABLE PLACEMENT
The diagram and inserts below identify the placement and proper way to attach the cable assemblies to the building using
103856
band
clamps.
ALL
SIDE
CABLE ASSEMBLIES
ARE
THE SAME LENGTH.
Upper Cable
ATTENTION:
The side cable positions are identical
for both sides of the frame.
All cable assemblies are
positioned at the ends of the frame regardless of the frame length.
All inserts show the circled locations as seen standing inside the frame.
4
2
3
1
Side Cable
ATTENTION:
W
rap this upper
cable connection using duct tape
to protect the cover
.