CLEARSPAN
™
MAJESTIC GREENHOUSES
22
Revision date: 06.21.16
Customer-Supplied
Baseboard
2
1
4
3
1
3
4
2
CABLE PLACEMENT
The diagram and inserts below identify the placement and
proper way to attach the cable assemblies to the building
using
103856
band clamps.
ATTENTION:
The cable positions are identical for both
sides of the frame. All cable assemblies are positioned
at the ends of the frame regardless of the frame length.
Frame length of your building may differ from what is
shown. Consult the Quick Start diagram for your shelter
for additional details.
All inserts show the circled locations as seen standing
inside the frame.