
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
10
StreetSmart Small Count Fiber Hand-Off Box
Installation Manual
_________________________________________________________
Manual 021728 REV A - Aug 2020
Route the incoming fiber up and around the radius
rod. Transition the fiber up onto the top of the swinging
bulkhead.
Inspect, clean if necessary, and then connect the fiber
into the designated adapter.
Utilize the two tie-down points and the provided velcro
to form a loop to secure the fibers on top of the bulk
-
head.
9.
10.
11.
Mounting
Four mounting locations are present on the base of the hand-off box. These will be utilized to install the box to the mounting
bracket, in wall, pole, and aerial mount applications.