19
FieldSmart
®
FiberFlex 2000
__________________________________________________________
Installation Manual
Direct: 763.476.6866 • National: 800.422.2537 • www.SeeClearfield.com • [email protected]
Manual 021574 REV A - June 2020
User-Supplied Items
Supply the following items for cabinet installation.
Tools
Bring the following tools to the installation site:
• Power drill with universal socket and screwdriver bit sets
•
Socket wrench/nut driver set (standard)
•
Box wrench set (standard)
•
Screwdriver set (standard)
• Beam Level
•
Insulated needle-nose pliers
• Wire stripper
• Compression crimping tool
•
Fiber cleaver
•
Fiber splicer
• RB Razor-Sharp Cutting Edge knife, or another similar tool
Materials
Bring the following materials to the installation site:
• Leveling shims
• Silicone sealant
• Strain relief for #6-8 AWG wiring.
Equipment
Bring the following equipment to the installation site:
• Digital multi-meter
• Optical power meter
• Digital multi-function test set