background image

 

 

Page 4 of 10 

P/N G0200181 Rev A, 1.0.12.14.2015

 

 

ClearCube Technology, Inc. 

3700 W Parmer Lane 

Austin, TX 78727 

(512) 652-3500 

www.clearcube.com 

Rack Rails and Mounting 

 

Rack rail 
components 

Two rack rail assemblies are included with a SmartVDI-110 Server. Each assembly has two sections: 

 

Inner rails:

 attach to the workstation chassis (the inner rail is pre-attached), and 

 

Outer rack rails:

 attach to rack 

The picture below shows the inner chassis rails and the outer rack rails. 

 

  

Continued on next page 

 

 

Inner Rail

 

Pre-Assembled 

Inner Rail Extension

 

Attach to Chassis 

Outer Rack Rails

 

Slide Front into Rear & Attach 

Front and Rear Brackets to Rack 

Front Bracket

 

Rear Bracket

 

Содержание SmartVDI-110

Страница 1: ...TA DOM for system startup Up to four storage drives SSD HDD or both LSI SAS host bus adapter NVIDIA GRID graphics card optional up to two Teradici PCoIP Offload card optional Fiber NIC controller optional Power cable s This Quick Start Guide Motherboard documentation SAS host bus adapter documentation If included in on server configuration documentation for graphics card and PCoIP Offload card Not...

Страница 2: ...dicated IPMI port Support for IPMI 2 0 SmartVDI 110 front panel The picture and table below show indicators and buttons on the front panel of a SmartVDI 110 Indicator or Button Description 1 Overheat Fan Fail Solid overheat condition Flashing fan failure To troubleshoot ensure that cables do not obstruct air flow ambient room temperature is appropriate and all fans are installed and operating Also...

Страница 3: ... of a SmartVDI 110 Description Server I 0 Connectors 8 Power connector 9 Power connector 10 Dedicated IPMI LAN port 11 USB 1 port 12 USB 0 port 13 LAN 1 port 14 LAN 0 port 15 VGA port 16 Unit ID Button press to illuminate LED for visual identification in rack I O Cards 17 PCoIP offload card optional 18 LSI Host bus adapter 19 10GBASE T 10 GbE fiber NIC optional 8 9 10 11 12 13 14 15 16 17 18 19 PC...

Страница 4: ... SmartVDI 110 Server Each assembly has two sections Inner rails attach to the workstation chassis the inner rail is pre attached and Outer rack rails attach to rack The picture below shows the inner chassis rails and the outer rack rails Continued on next page Inner Rail Pre Assembled Inner Rail Extension Attach to Chassis Outer Rack Rails Slide Front into Rear Attach Front and Rear Brackets to Ra...

Страница 5: ... Repeat these steps to attach the other extension rail on the other side of the chassis Next step assemble outer rack rails Assemble outer rack rails Outer rack rails consist of two sections a longer front section and a shorter rear section Slide these together to assemble the rail Step Action 1 Identify the left and right outer rack rails by examining the ends brackets These brackets bend outward...

Страница 6: ...outer rack rail with the holes on the rack and secure with the screws provided see B in the adjacent picture 4 Repeat these steps with the other outer rack rail assembly Next step Install the workstation in a rack Installing in rack To install a SmartVDI 110 Server in a rack 1 While carefully lifting the workstation slide the inner rail extensions into the front of the outer rack rails 2 Push the ...

Страница 7: ... cables to the LAN ports 13 and 14 on the rear of the chassis and connect the other end of the cable s to a network router or switch 3 Connect one or more Ethernet cables to the Dedicated IPMI port 10 on the rear of the chassis and connect the other end of the cable to a network router or switch 4 From the rear of the chassis connect the included power cables to the power connectors 8 and 9 on the...

Страница 8: ...network address ClearCube recommends giving the controller a static IP address You can easily change this setting from the BIOS Step Action 1 Access the BIOS as shown above in Accessing the BIOS 2 Use the keyboard arrow keys to select the IPMI menu 3 Select BMC Network Configuration Press ENTER 4 Select Update IPMI LAN Configuration and press ENTER Select Yes and then press ENTER 5 Select Configur...

Страница 9: ...the graphics card memory access point below the system s first 4 GB of physical memory Specify this setting in the BIOS to guarantee the memory configuration The steps below show how to change the BIOS setting Step Action 1 Access the BIOS as shown above in Accessing the BIOS 2 Use the keyboard arrow keys to select the Advanced menu 3 Select the Above 4G Decoding option Press ENTER 4 Select Disabl...

Страница 10: ...or proper disposal instructions For assistance contact ClearCube at recycle clearcube com Related Information and Support Related information The table below shows additional documents about server configuration operation and maintenance For information about See Deployment guidelines for SmartVDI servers SmartVDI Converged Infrastructure Platform Deployment Guide NVIDIA GRID graphics card configu...

Отзывы: