background image

w w w . c l a s s i c

e x h i b i t s . c o m

Step 1

Page 1 of 4

866.652.2100

© 2011

WHEN DISASSEMBLING ALUMINUM EXTRUSION, TIGHTEN ALL

SETSCREWS AND LOCKS TO PREVENT LOSS DURING SHIPPING

Order #XXXXX - LTK-1139 - General Layout

Setup:

3)  Use standoff screws to secure the front panel with 

      door and back panel of the pedestal to the side panels.

4)  After assembling front, back, and side panels, 

      slide floor into the bottom of the pedestal.  The

      floor will sit on pins on the inside of the side panels.

5)  After floor is in place, use Velcro attachments to 

      install shelf.

6) Slide assembled base againt assembled vertical stand,

     then secure with thumbscrews, see 

NOTE

.

Standoff

Screw

Front Panel 

with Door

Floor 

Shelf with

Velcro Supports

Item

1

2

3

Description

Base Plate

36”h Lower Vertical Extrusion

36”h Upper Vertical Extrusion

Qty.

1

1

1

Steps:

1) Attach lower vertical extrusion [2] to base plate [1],

    See detail D on general info page.

2) Attach upper vertical extrusion [3] to 

    lower vertical extrusion [2].

1

2

3

QTY. 2

Thumbscrew

attachment

See Note

Modul Vertical Stand

Pedestal Base

M

ONITOR

 M

OUNT

 A

TTACHMENT

Attach monitor mount to vertical

extrusions after assembly.

Slide Mount into Groove
of Vertical Extrusion.

Tighten 

Setscrew

Attach top Plate

and tighten screws

NOTE:

 Using door opening go 

inside base and attach thumbscrews

to secure pedestal to vertical extrusion.

*

*

Отзывы: