background image

© 2019

Step 4 of 4

Order #XXXXX

1

1A

2

2A

7

8

8

8A

8A

7

Shelf

Support

7A

3

3A

4

5

6

Door

Door

Infill

Infill

Frame Assembly

Item

1,1A

2,2A

3,3A

4

5

6

7,7A

8,8A

Qty.

1,1

1,1

1,1

1

1

1

2,2

2,2

Description

46.25” CEI-110 Horizontal Extrusion

37.5” CEI-110 Vertical Extrusion

37.5” S44 Vertical Extrusion

37.5” S44 Vertical Extrusion w/Door Hinges

37.5” S44 Vertical Extrusion w/Door Stops

37.5” S44 Vertical Extrusion w/Door Hinges

14.153” Z45 Horizontal Extrusion

20.408” Z45 Horizontal Extrusion

Steps:

1) Assemble frame extrusions [1] [1A] [2] and [2A]. See CEI152 Frame Assembly sheet.

2) Connect lights and transformer. See 

Light to Light Connection

 and 

Light to Transformer Connection

 details.

3) Attach horizontals [7] and [8] between verticals [3] [3A] [4] [5] and [6].

4) Slide Infills between verticals [3] [4] and [3A] [6].

5) Connect doors between verticals [4] [5] and [5] [6]. See 

Door Connection

 detail.

6) Attach horizontals [7A] and [8A] between verticals [3] [3A] [4] [5] [6] and on top of infills and doors.

7) Connect shelf supports to Velcro on inside of infills.

7A

Door

Hinge

Hinge

Pin

Slide Pin into

hinge attached

to vertical. 

Slide door

hinge over pin.

Door Connection

*

*

*

*

*

Transformer

to power

+

+

+

-

-

-

to power

Lights

Male

Male

Female

Female

Transformer

96W / 4A / 24V

Light to Light Connection

Light to Transformer Connection

Maximum of 9 lights per transformer.

MOD-1700 Cabinet with USB (Cont’d)

Содержание gravitee GK-1012

Страница 1: ...der XXXXX Top View Perspective View 10 10 GK 1012 General Layout If you would like to tell us about your experience with your setup instructions please email us at info classicexhibits com SETUP INSTR...

Страница 2: ...2019 Order XXXXX 1 sq foot GK 1012 Grid View...

Страница 3: ...e Heat and UV exposure will warp and fade components Retain all provided Packing Materials All provided packing materials are for ease of repacking component protection Disassembly For loss prevention...

Страница 4: ...Connection Corner Connection TS RV 2 Upper Horizontal Lower Horizontal Upper Horizontal Lower Horizontal TS RV 2 8 Brackets Total 4 TS RV 2 4 A1 L Brackets A1 A1 Slide verticals over brackets of lowe...

Страница 5: ...2019 Order XXXXX Crate 1 of 1 Crate Packing...

Страница 6: ...ons flat on floor See CEI152 Frame Assembly sheet 2 Connect light cords and attach transformers See Light to Light Connection and Light to Transformer Connection details Keep A1 brackets attached to e...

Страница 7: ...et for details 4 Attach assembled lightbox to connector 6 See Lightbox Attachment detail 5 Install SEG graphic to assembled panels See General Information sheet for SEG Graphic Installation instructio...

Страница 8: ...move the graphic from the frame locate the fabric pull tab Gently pull up on the tab to remove the fabric Step 1 Insert corner A Turn edge of graphic so silicon welt is perpendicular to face of graphi...

Страница 9: ...eet 2 Connect lights and transformer See Light to Light Connection and Light to Transformer Connection details 3 Attach horizontals 7 and 8 between verticals 3 3A 4 5 and 6 4 Slide Infills between ver...

Отзывы: