© 2019
Step 4 of 4
Order #XXXXX
1
1A
2
2A
7
8
8
8A
8A
7
Shelf
Support
7A
3
3A
4
5
6
Door
Door
Infill
Infill
Frame Assembly
Item
1,1A
2,2A
3,3A
4
5
6
7,7A
8,8A
Qty.
1,1
1,1
1,1
1
1
1
2,2
2,2
Description
46.25” CEI-110 Horizontal Extrusion
37.5” CEI-110 Vertical Extrusion
37.5” S44 Vertical Extrusion
37.5” S44 Vertical Extrusion w/Door Hinges
37.5” S44 Vertical Extrusion w/Door Stops
37.5” S44 Vertical Extrusion w/Door Hinges
14.153” Z45 Horizontal Extrusion
20.408” Z45 Horizontal Extrusion
Steps:
1) Assemble frame extrusions [1] [1A] [2] and [2A]. See CEI152 Frame Assembly sheet.
2) Connect lights and transformer. See
Light to Light Connection
and
Light to Transformer Connection
details.
3) Attach horizontals [7] and [8] between verticals [3] [3A] [4] [5] and [6].
4) Slide Infills between verticals [3] [4] and [3A] [6].
5) Connect doors between verticals [4] [5] and [5] [6]. See
Door Connection
detail.
6) Attach horizontals [7A] and [8A] between verticals [3] [3A] [4] [5] [6] and on top of infills and doors.
7) Connect shelf supports to Velcro on inside of infills.
7A
Door
Hinge
Hinge
Pin
Slide Pin into
hinge attached
to vertical.
Slide door
hinge over pin.
Door Connection
*
*
*
*
*
Transformer
to power
+
+
+
-
-
-
to power
Lights
Male
Male
Female
Female
Transformer
96W / 4A / 24V
Light to Light Connection
Light to Transformer Connection
Maximum of 9 lights per transformer.
MOD-1700 Cabinet with USB (Cont’d)
Содержание gravitee GK-1012
Страница 2: ...2019 Order XXXXX 1 sq foot GK 1012 Grid View...
Страница 5: ...2019 Order XXXXX Crate 1 of 1 Crate Packing...