background image

6

OPERATION

1)  Insert the appropriate metering tips into the chemical feed lines (see illustration, page 5).

2)  Fill the holding tank with warm water (not exceeding 120 °F). 

Do not

 add any chemical to    

 the 

tank.

3)  Prepare the area for cleaning by emptying waste receptacles, clearing debris, removing  

 

 

paper products, blowing out vents, and sweeping fl oors.  

4)  Connect the 25 ft power cord to the pig-tail on the rear of the machine. Test the GFCI on  

 

 

the power cord before each use. Plug the GFCI protected power cord into an outlet. 

5) 

PRIME THE PUMP

: Attach the priming hose to the outlet quick disconnect and place the    

 

open end of the hose into the recovery tank. Turn on the pump and let it run until the pump 

 

is completely primed (no visible air in the water stream). Turn the pump off. 

 

NOTE:

 prime the machine before you place the chemical feed tubes into chemical    

 

 containers.
6)  Disconnect the priming hose and attach the solution hose to the quick disconnect.
7)  Attach the spray gun to the other end of the solution line.
8)  Place chemicals in the molded-in chemical bottle containers on the rear of the machine.  

 

 

Insert one of the feed lines into one of the chemical containers. Secure the line by screwing  

 

on the cap. The chemical will feed from which ever container the selector valve on the switch  

 

plate is turned towards and when the gun is used in the low pressure setting. Use chemicals  

 

with a pH of between 4 and 12. Never add chemicals to the clean water tank.

9)  Set the spray gun to low pressure by sliding the pressure selector forward (low pressure  

 

 

= forward; high pressure = back).

10)   Turn on the pump switch (push button) and spray through the gun for a few seconds to fi ll    
 

 the line with solution.

11)  Apply the chemical to the walls and fi xtures from the bottom up. Spray the fl oor last as you   
 

work your way out of the room.

12)  Allow the chemical to work for the proper amount of dwell time, according to the chemical    
 

manufacturer’s directions. Agitate heavily soiled areas with a scrub brush.

13)  Turn off the chemical injector valve by turning the selector to the down position. 
14)  Set the spray gun to high pressure and rinse the area from the top down.
15)  Connect the vacuum hose, attach the squeegee, and turn on the vacuum (rocker switch).
16)  Squeegee off the mirrors, pick up the liquid off the fl oor with the fl oor tool. If you have the    
 

optional blow dry hose, use it to dry the fi xtures.

17)  Drain the recovered water into a utility sink or toilet.  NOTE: Keep the top of the drain hose   
 

higher than the water level in the tank to avoid uncontrolled discharge of water when you    

 

open the cap on the hose.

       

CAUTION

To avoid vacuum motor damage, always use a defoamer any time foam is present. Before you 
turn on the vacuum always make sure the fi lter screen on the ball fl oat is clean and that the ball 
can travel freely.

       

RE-PRIMING THE PUMP

If the pump looses prime between jobs, follow the instructions to PRIME THE PUMP, above. If 
that doesn’t get water fl owing, put the priming hose into the vacuum inlet hose barb and cover the 
rest of the space around the priming hose with your hand. Turn on the vacuum (with the pump 
also running) and let the suction of the vacuum assist in getting water into the pump.

Содержание TFC 400

Страница 1: ...1 OPERATOR MANUAL Clarke MODEL 56380773 11 09 Rev C Document Number 56380889 TFC 400 ...

Страница 2: ...into water return it to a service center Do not pull by the cord use the cord as a handle damage the cord or allow the cord or the machine near heated surfaces Do not unplug by pulling on the cord To unplug grasp the cord end Do not handle the plug the cord or the machine with wet hands Do not put any objects into openings Do not use with any opening blocked keep free of dust lint hair and anythin...

Страница 3: ... NAME AND PHONE NUMBER OF YOUR DISTRIBUTOR ______________________________ UNPACKING When the machine arrives carefully inspect the shipping carton and the machine for damage If damage is evident save the shipping carton so that it can be inspected by the carrier Contact the Clarke customer service department immediately to file a freight damage claim DO NOT OPERATE THE MACHINE UNTIL YOU HAVE READ ...

Страница 4: ...is hose is used to empty the recovery tank NOTE hold the end of the hose above the water level in the tank to avoid sudden uncontrolled flow of waste water when you remove the cap then lower the hose slowly to control the rate of discharge Quick Disconnect 9 Point of attachment for the Spray Hose 7 Switch Plate 10 The machine s on off switches for the vacuum and for the pump are located here and t...

Страница 5: ... solution comes out of the machine and the attachment point for the solution hose METERING TIPS The chemical metering tips allow you to select the ratio of chemical to water as the water flows out of the machine Insert the correct metering tip for the desired mixture into the chemical siphon tube 1 2 3 4 METERING TIPS COLOR HOLE SIZE MIX RATIO FLOW RATE Orange 0 007 1 oz 128 oz 1 0 oz gal Pink 0 0...

Страница 6: ...sliding the pressure selector forward low pressure forward high pressure back 10 Turn on the pump switch push button and spray through the gun for a few seconds to fill the line with solution 11 Apply the chemical to the walls and fixtures from the bottom up Spray the floor last as you work your way out of the room 12 Allow the chemical to work for the proper amount of dwell time according to the ...

Страница 7: ...7 TFC 400 11 04 09 O I O 1 2 5 6 10 16 11 12 13 18 15 21 22 17 9 3 26 19 8 7 56380773 27 28 29 24 14 25 23 20 23B 4 ...

Страница 8: ... 14 56380841 1 Lid and ring 4 15 56380923 1 Pump and motor 400 psi complete 16 56380908 1 Motor DC pump drive 17 56380902 1 Pump 400 psi complete no motor 18 56380929 1 Filter pump in line with hoses 19 56380805 1 Hose vacuum 25 ft complete with cuffs 20 56380787 1 Quick disconnect kit with washers 21 56380934 1 Grommets and foam 22 56380797 1 Cap drain and brass fitting 23 56380798 1 Castor kit 2...

Страница 9: ...ool Kit standard complete 56380937 1 2 6 1 56380854 Squeegee hand held 12 2 56380853 Handle 12 for hand squeegee 3 56380838 Solution hose complete 25 ft 4 56380855 Brush dual surface polypropylene 5 56108027 Wand two piece snap fit 6 56108028 Squeegee 14 for floor 7 56108072 Spray gun complete 8 56380802 Metering tip kit two each of seven sizes 9 56108024 Priming hose assembly for 400 psi pump 10 ...

Страница 10: ...s 2 For optimum performance flush the Chemical Feed lines after every job by replacing the chemical containers with containers of clear water and spraying through the gun until the fluid stream is clear See the Maintenance Schedule below 3 The pump seals and or valves in the high pressure pumps may need to be replaced after about 1000 hours of use if the pump begins to loose performance or to leak...

Страница 11: ...11 NOTES ...

Страница 12: ...cation Transportation charges to and from the repair location must be prepaid by the purchaser c Clarke will repair the product or replace any defective parts without charge within a reasonable time after the receipt of the product Clarke s liability under this warranty is limited to repair of the product and or replacement of parts and is given to the purchaser in lieu of all other remedies inclu...

Отзывы: