2-29
Catalyst 2950 Desktop Switch Hardware Installation Guide
78-11157-02
Chapter 2 Installation
Running POST
Figure 2-24 Inserting the Terminal Block in the Block Header
Step 8
Remove the tape from the circuit-breaker switch handle, and move the
circuit-breaker handle to the on position.
Running POST
After the power is connected, the switch automatically begins POST, a series of
tests that verifies that the switch functions properly. When the switch begins
POST, the system LED is off. If POST completes successfully, the LED turns
green. If POST fails, the LED turns amber. See
determine a corrective action.
Note
POST failures are usually fatal. Call Cisco Systems immediately if your
switch does not pass POST.
DC INPUT FOR REMO
TE
POWER SUPPL
Y
SPECIFIED IN MANU
AL.
+12V @4.5A
36 - 72V
1 - 0.5A
CONSOLE
A
B
Tie wrap
65293