Chapter 18 DLPs A100 to A199
DLP-A189 Verify that a 1+1 Working Slot is Active
Step 14
Verify that the card boots up properly.
Step 15
Click the
Inventory
tab and verify that the new card appears as a DS3N-12E.
Step 16
Click the
Provisioning > Protection
tabs.
Step 17
Click
Create
.
Step 18
Type a name for the protection group in the Name field (optional).
Step 19
Click
Type
and choose
1:N (card)
from the drop-down list.
Step 20
Verify that the DS3N-12E card appears in the Protect Card field.
Step 21
In the Available Cards list, highlight the cards that you want in the protection group. Click the arrow
(
>>
) button to move the cards to the Working Cards list.
Step 22
Click
OK
.
The protection group should appear in the Protection Groups list on the Protection subtab.
Step 23
Return to your originating procedure (NTP).
DLP-A189 Verify that a 1+1 Working Slot is Active
Step 1
In node view, click the
Maintenance > Protection
tabs.
Step 2
In the Selected Group area, verify that the working slot/port is shown as Working/Active. If so, this task
is complete.
Step 3
If the working slot says Working/Standby, perform a Manual switch on the working slot:
a.
In the Selected Group area, choose the Protect/Active slot.
a.
In the Switch Commands field, choose
Manual
.
b.
Click
Yes
in the confirmation dialog box.
Step 4
Verify that the working slot is carrying traffic (Working/Active).
Note
If the slot is not active, look for conditions or alarms that might be preventing the card from
carrying working traffic. Refer to the
Cisco ONS 15454 Troubleshooting Guide
.
Step 5
When the working slot is carrying traffic, clear the Manual switch:
a.
In the Switch Commands field, choose
Clear
.
b.
Click
Yes
in the confirmation dialog box.
Purpose
This task verifies that a working slot in a 1+1 protection scheme is active
(and that the protect slot is in standby).
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Maintenance or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...