DLP-A94 Path Protection Switching Test
Step 13
Clear the east switch:
a.
Right-click the east port of the BLSR node where you invoked the Force Span switch and choose
Set East Protection Operation
.
b.
In the Set East Protection Operation dialog box, choose
CLEAR
from the drop-down list.
c.
Click
OK
.
d.
Click
Yes
in the Confirm BLSR Operation dialog box.
On the network view graphic, the Force Span switch is removed, the F indicating the switch is
removed, and the span lines between BLSR nodes will be purple and green. The span lines might
take a few moments to change color.
Step 14
From the File menu, choose
Close
to close the BLSR window.
Step 15
Return to your originating procedure (NTP).
DLP-A94 Path Protection Switching Test
Note
Although a service interruption under 60 ms might occur, the test circuit should continue to work before,
during, and after the switches. If the circuit stops working, do not continue. Contact your next level of
support.
Step 1
From the View menu, choose
Go to the Network View
.
Step 2
Right-click a network span and choose
Circuits
.
The Circuits on Span dialog box shows the path protection circuits, including circuit names, locations,
and a color code showing which circuits are active on the span.
Step 3
Initiate a Force switch for all circuits on the span:
a.
Click the
Perform UPSR span switching
field.
b.
Choose
FORCE SWITCH AWAY
from the drop-down list.
c.
Click
Apply
.
d.
In the Confirm UPSR Switch dialog box, click
Yes
.
e.
In the Protection Switch Result dialog box, click
OK
.
In the Circuits on Span dialog box, the Switch State for all circuits is FORCE. Unprotected circuits
will not switch.
Step 4
Clear the Force switch:
a.
Click the
Perform UPSR span switching
field.
Purpose
This task verifies that a path protection span is switching correctly.
Tools/Equipment
None
Prerequisite Procedures
DLP-A60 Log into CTC, page 17-66
Required/As Needed
Required
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 Series
Страница 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Страница 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Страница 126: ...4 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 4 Turn Up Node NTP A256 Set Up SNMP ...
Страница 168: ...5 42 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 5 Turn Up Network NTP A172 Create a Logical Network Map ...
Страница 304: ...10 8 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 10 Change Node Settings NTP A87 Change SNMP Settings ...
Страница 410: ...16 4 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Chapter 16 Power Down the Node NTP A114 Power Down the Node ...
Страница 510: ...17 100 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 17 DLPs A1 to A99 DLP A99 Determine Available VLANs ...
Страница 746: ...20 102 Cisco ONS 15454 Procedure Guide R5 0 March 2005 Chapter 20 DLPs A300 to A399 DLP A399 Install a UBIC H EIA ...
Страница 828: ...A 14 Cisco ONS 15454 Procedure Guide R5 0 December 2004 Appendix A CTC Information and Shortcuts Equipment Inventory ...
Страница 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...