Chapter 10 Manage the Node
NTP-G85 Modify or Delete OSC Terminations, GCC Terminations, and Provisionable Patchcords
NTP-G85 Modify or Delete OSC Terminations, GCC Terminations,
and Provisionable Patchcords
Caution
Deleting an OSC termination can cause you to lose visibility of nodes that do not have other OSCs or
network connections to the CTC computer.
Step 1
Complete the
“DLP-G46 Log into CTC” task on page 2-25
. If you are already logged in, continue with
Step 2.
Step 2
In node view, complete the following tasks as needed:
•
To modify a GCC termination, complete the
“DLP-G184 Change a GCC Termination” task on
.
•
To delete a GCC termination, complete the
“DLP-G185 Delete a GCC Termination” task on
.
•
To delete an OSC termination, complete the
“DLP-G186 Delete an OSC Termination” task on
.
•
To delete a provisionable patchcord, complete the
“DLP-G187 Delete a Provisionable Patchcord”
.
Stop. You have completed this procedure.
Purpose
This procedure modifies GCC terminations, and deletes provisionable
patchcords, OSC terminations, and GCC terminations.
Tools/Equipment
None
Prerequisite Procedures
DLP-G76 Provision GCC Terminations, page 7-14
NTP-G38 Provision OSC Terminations, page 3-84
DLP-G99 Create a Provisionable Patchcord, page 6-11
Required/As Needed
As needed
Onsite/Remote
Onsite or remote
Security Level
Provisioning or higher
Содержание ONS 15454 DWDM
Страница 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...