Chapter 3 Turn Up a Node
NTP-G22 Verify Common Card Installation
Figure 3-1
Cisco MetroPlanner Shelf Layout
If you not do not have all the reports and files listed in
, do not continue. See your site or
network planner for the required information and files.
Step 2
for reference. You will need information from the reports during node turn-up.
Stop. You have completed this procedure.
NTP-G22 Verify Common Card Installation
Step 1
Verify that two TCC2/TCC2P cards are installed in Slots 7 and 11.
Step 2
Verify that the green ACT (active) LED is illuminated on one TCC2/TCC2P and the amber STBY
(standby) LED is illuminated on the second TCC2/TCC2P.
Purpose
This procedure verifies that the ONS 15454 node has two TCC2/TCC2P
cards installed and is ready for turn-up.
Tools/Equipment
None
Prerequisite Procedures
Chapter 1, “Install the Shelf and Common Control Cards”
Required/As Needed
Required
Onsite/Remote
Onsite
Security Level
Retrieve or higher
Содержание ONS 15454 DWDM
Страница 38: ...Figures xxxviii Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 54: ...Procedures liv Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 ...
Страница 64: ... 64 Cisco ONS 15454 DWDM Installation and Operations Guide R6 0 August 2005 Chapter ...