We recommend that you use two people to lift the door onto the FCC.
Note
Figure 15: Attaching the Front Door
Grounding cable
3
Front door
1
Door hinges
2
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
26
Installing the Power Enclosure, Power Trays, and Exterior Cosmetics
Installing the Front Exterior Cosmetics