4-10
Cisco Network Convergence System 4000 Series Hardware Installation Guide
Chapter 4 Installing Power Components
Installing the Chassis Ground Cable
Figure 4-6
Attaching to Front NEBS Bonding and Grounding Point
Figure 4-7
Attaching to Side NEBS Bonding and Grounding Point
Step 3
Use the torque wrench to tighten the bolts to a torque of 35 in-lb (3.95 N-m).
36391
8
1
2
1
Screws
2
Lock washers
1
NEBS grounding point on right side of the
chassis
2
Screws
3
Lock washers