background image

C H A P T E R

 Operations and Management 1-1

1

Operations and Management

This chapter provides a list of activities you should complete before you attempt to operate your
network of LightStream 2020 multiservice ATM switches (LS2020 switches).

This chapter also lists the operations and management activities that you can perform on a network of
LS2020 ATM switches. It describes the tools and methods that you can use to manage your network,
depending on your hardware and software configuration.

Where to Begin

Before you attempt to operate your network, each LS2020 switch should be fully installed, powered on, and
configured. The following checklist specifies the tasks that should be complete before you begin operating and
managing your network. For information on these tasks, see the LightStream 2020 Installation Guide and
the LightStream 2020 Configuration Guide, or check with your network administrator. See the appropriate
setup procedures described in the LightStream 2020 Installation Guide. Depending on how you choose to
set up your network, you may not need to perform all of the setup procedures.

Things to Do Before Operating Your LS2020 Network

1

Read the

LightStream

2020 System Overview and become familiar with the LS2020 documentation set.

2

Make sure that the installation is complete, the network is powered up, and basic configuration
information has been entered.

3

Make sure that the appropriate setup procedures have been completed.

4

Become familiar with the CLI and any other network management tools available to you.

Network Operation Tasks

You can perform a wide variety of tasks on your LS2020 network. You will perform some tasks every
day and others only occasionally. This section lists the many different types of tasks that you will
perform.

Содержание LS2020

Страница 1: ...ightStream 2020 Installation Guide and theLightStream 2020 Configuration Guide orcheckwithyournetworkadministrator Seetheappropriate setup procedures described in the LightStream 2020 Installation Guide Depending on how you choose to set up your network you may not need to perform all of the setup procedures Things to Do Before Operating Your LS2020 Network 1 Read the LightStream 2020 System Overv...

Страница 2: ...s Configure a switch Change the existing network configuration Define and assign bridge IP and IPX filters Write command line interface CLI scripts Perform an orderly shutdown Isolate port problems Collect statistics Activate and deactivate cards ports and circuits Load diagnostics to diagnose network problems Verify the software installation Customize traps Change MIB attribute values Force a swi...

Страница 3: ...mands in this document to perform many management tasks LS2020 Monitor The LS2020 monitor provides graphical displays of individual LS2020 systems cards and ports In most instances you will want to use it to monitor the network However if the monitor is unavailable to you you can use the CLI commands in this document to perform many monitoring tasks For more information on the LS2020 monitor see t...

Страница 4: ...ork Management Scenarios You can manage your network in a number of different ways depending on your hardware and software and whether you want traps to be interleaved with or separated from your general monitoring and control functions Table 1 1 lists the different network scenarios that you may consider using to monitor and control the network The preferred method of network configuration monito...

Страница 5: ... processor NP and displays on the VT100 Manage network from a Sun SPARCstation using the CLI and a third party trap monitoring tool 1 Monitor and control the network from the Sun SPARCstation using the CLI and a third party NMS The configurator the CLI and the third party NMS trap monitoring tool run and display on the SPARCstation Manage network from a non Sun workstation using the CLI only 1 Mon...

Страница 6: ...1 6 LightStream 2020 Network Operations Guide Network Management Scenarios ...

Отзывы: