6
IR510 WPAN Gateway and IR530 WPAN Range Extender Hardware Installation Guide
IR510 Installation
To unpack the IR510:
1.
Open the shipping container and carefully remove the contents.
2.
Return all packing materials to the shipping container, and save them.
3.
Ensure that all items listed in “Package Contents” section are included in the shipment. If any item is damaged or missing, notify your
sales representative.
Package Contents
IR510
Grounding lug with 2 screws
Mechanical kit, with 2 mounting brackets and 4 screws
Pointer cards for product and compliance documentation
IR510 Hardware Specifications
IMPORTANT: Be sure to review both the
IR510 Cautions and Warnings, page 4
and
Additional Information for Installation in a Hazardous
Environment (IR510 Only), page 4
before
mounting the IR510.
This section includes the following sections:
IR510 Hardware Specifications, page 8
IR510 Mounting Options, page 11
Connecting Protective Ground and Power for IR510, page 14