5-3
Cisco 12404 Internet Router Installation and Configuration Guide
OL-11636-01
Chapter 5 Maintaining the Cisco 12404 Internet Router
Tools and Equipment
•
Upgrading the RP and Line Card Memory, page 5-53
Before you perform the procedures in this chapter, review the following safety
information in the
Regulatory Compliance and Safety Information for the
Cisco 12000 Internet Routers
, Publication Number 78-4347-09). This document
is shipped with your Cisco 12404 router.
Tools and Equipment
The following section lists tools and equipment for unpacking, performing
maintenance, and setting up your Cisco 12404 router.
•
ESD-preventive strap
•
3/16-inch flat-blade screwdrivers
•
1/4-inch flat-blade screwdrivers
•
9/15-inch (14-mm) wrench
•
3/4-inch (19-mm) socket and ratchet wrench
•
2-mm allen wrench
•
Vacuum cleaner
•
Antistatic bag (or similar ESD-preventive container)
•
Number 2 Phillips screwdriver
Powering Off an AC Powered Router
To power off an AC powered router:
Step 1
Turnoff the AC PEM power switch for each AC PEM installed (
).
Step 2
Turn off all circuit breakers for AC source power.
Step 3
Unplug all power cords from all AC power source outlets.
Step 4
Attach an ESD-preventive strap to your wrist or ankle. Attach the ESD clip to the
chassis or to a bare metal surface.
todd.book Page 3 Tuesday, November 27, 2007 6:02 PM