Reverse Balancing the Node with EDR
189
Reverse Balancing the Node with EDR
Introduction
This section explains the reverse balancing procedures for the GS7000 Node using
EDR.
When balancing the reverse path, reference your system design print for the
required reverse signal level. Use appropriate padding and equalization to provide
proper signal level to the reverse transmitter.
CAUTION:
Never attempt to reconfigure the unit beyond its normal setup. Changes to the
node’s configuration may cause degradations that affect its performance. Do
not use digital carrier measurement to set up the forward or reverse paths.
Familiarize yourself with your cable system’s specifications before
performing the setup.
There are a variety of test equipment combinations that enable proper balancing of
the reverse path. Regardless of the type of equipment used, the balancing process is
fundamentally the same. A reverse RF test signal (or signals) of known amplitude is
injected into the RF path at the RF input of the node. The reverse transmitter
converts the RF test signal(s) to an optical signal and transmits it to the headend (or
hub site) via fiber optic cable. At the headend, the reverse optical receiver converts
the optical signal back to an RF signal that is then routed out through the receiver's
RF output. The amplitude of the injected test signal must be monitored at the
receiver's output, and compared to the expected (design value) amplitude.
Method of Generating and Monitoring Test Signals
The reverse RF test signals that are injected into the reverse path of the RF launch
amplifier being balanced may be generated by the following method.
Multiple CW signal (tone) generator
Reverse sweep transmitter
Содержание GS7000
Страница 1: ...Cisco 1 2 GHz GS7000 Node Installation and Operation Guide ...
Страница 2: ......
Страница 7: ...Contents v Glossary 213 Index 225 ...
Страница 8: ......
Страница 19: ...Laser Warning Labels xvii ...
Страница 20: ......
Страница 23: ...Equipment Description 3 The following illustration shows the external housing of the 1 2 GHz GS7000 Node ...
Страница 34: ......
Страница 38: ...Chapter 2 Theory of Operation 18 Left Right Segmented ...
Страница 84: ...Chapter 2 Theory of Operation 64 1 1 EDR Transmitter 3 2 1 EDR Transmitter 7 ...
Страница 96: ...Chapter 3 Installation 76 ...
Страница 108: ......
Страница 112: ...Chapter 4 Setup and Operation 92 Left Right Segmented ...
Страница 116: ...Chapter 4 Setup and Operation 96 Right side Ports 4 5 and 6 illustration ...
Страница 143: ...Opening and Closing the Housing 123 ...
Страница 158: ......
Страница 172: ......
Страница 232: ...Appendix C Expanded Fiber Tray 212 ...
Страница 244: ......
Страница 253: ......