Chapter 5 Maintenance
122
Opening and Closing the Housing
Overview
Installation or maintenance of the 1.2 GHz GS7000 Node requires opening the
housing to access the internal modules.
Proper housing closure is important to maintaining the node in good working
condition. Proper closure ensures a good seal against the environment, protecting
the internal modules.
Opening the Housing
Open the housing as follows.
1
Remove the bolts securing the lid to the base.
2
Carefully open the lid to allow access to the inside of the housing.
3
Inspect gaskets on the cover flange and on the test port plugs.
4
Replace any gaskets showing signs of wear (cracked, twisted, pinched, or dry)
with new, silicon-lubricated gaskets.
Closing the Housing
Close the housing as follows.
1
Ensure any worn gaskets are replaced, and the gaskets are clean and in the
correct position.
2
Carefully close the lid.
CAUTION:
Use caution when closing housing. Improper closing may result in the unit
not being sealed from the environment.
3
For strand-mounted housings, pull the lid away from the base and remove the
slack from the hinge before rotating the lid up toward the base.
4
Ensure no cables are pinched between lid and base.
5
Secure lid to base with bolts. Tighten from 5 to 12 ft-lbs (6.8 to 16.3 Nm) in the
sequence shown in the following illustration. Repeat the sequence twice, ending
with the final torque specification.
Содержание GS7000
Страница 1: ...Cisco 1 2 GHz GS7000 Node Installation and Operation Guide ...
Страница 2: ......
Страница 7: ...Contents v Glossary 213 Index 225 ...
Страница 8: ......
Страница 19: ...Laser Warning Labels xvii ...
Страница 20: ......
Страница 23: ...Equipment Description 3 The following illustration shows the external housing of the 1 2 GHz GS7000 Node ...
Страница 34: ......
Страница 38: ...Chapter 2 Theory of Operation 18 Left Right Segmented ...
Страница 84: ...Chapter 2 Theory of Operation 64 1 1 EDR Transmitter 3 2 1 EDR Transmitter 7 ...
Страница 96: ...Chapter 3 Installation 76 ...
Страница 108: ......
Страница 112: ...Chapter 4 Setup and Operation 92 Left Right Segmented ...
Страница 116: ...Chapter 4 Setup and Operation 96 Right side Ports 4 5 and 6 illustration ...
Страница 143: ...Opening and Closing the Housing 123 ...
Страница 158: ......
Страница 172: ......
Страница 232: ...Appendix C Expanded Fiber Tray 212 ...
Страница 244: ......
Страница 253: ......