Installing the Storage Subsystem in the Rack
Installation
18
Cisco C880 M4 Storage Subsystem Operating Manual for Server with E7-8800 v3 CPU
Insert the sliding rails in the rack. Compress the sliding rail to its length.
Figure 5: Right side sliding rail (rear side of the rack, tapered mounting bolts at height unit
13)
Figure 6: Left side sliding rail (rear side of the rack, tapered mounting bolts at height unit
13)