![Cisco BTS 10200 Softswitch Скачать руководство пользователя страница 328](http://html.mh-extra.com/html/cisco/bts-10200-softswitch/bts-10200-softswitch_troubleshooting-manual_67550328.webp)
7-96
Cisco BTS 10200 Softswitch Troubleshooting Guide, Release 5.0.x
OL-8723-19
Chapter 7 Maintenance Troubleshooting
Troubleshooting Maintenance Alarms
Figure 7-2
Corrective Action for Maintenance Event (7) (Mate Rejected Changeover)
Primary Failed To Come Up in Active State
Note
The attempted changeover could be caused by a forced (operator) switch, or it could be caused by
secondary instance rejecting changeover as primary is being brought up.
Bring down the primary
instance.
52071
No
Yes
Contact your supervisor. You
can continue to process using
the second instance.
(without backup) until decision
is made to shut down both
platforms and restart. This will
stop all processing, and will
affect service.
If approved by management,
Bring down secondary.
Is mate in
stable state?
Was
changeover
successful?
Contact Cisco TAC
for assistance.
No
Attempt to bring up the primary instance of EM
S
, CA or F
S
has
failed, because the secondary instance rejects changeover from
active to standby. MAINTENANCE event #7 was generated
"MATE rejected changeover".
Yes
Restart the
secondary instance.
Done.
Restart the primary instance
(platform start).
Is secondary
in active state?
Bring down the secondary
instance (platform stop).
Restart the primary instance.
Is primary in
stable state?
Restart the
secondary instance.
Restart the
secondary instance.
Wait
3
minutes. Then
check status of pair.
Contact Cisco TAC
for assistance.
Also contact your
supervisor.
If the secondary
is running without
backup, or if neither
the primary nor
secondary is
running, additional
steps are required.
Yes
No
No
Yes