Receiving the Cisco ASR 902 Router
Each Cisco ASR 902 Router chassis is shipped in a container that is strapped to a pallet, as illustrated in the
figure below.
Figure 31: Cisco ASR 902 Router Packaged for Shipping
Description
Label
Description
Label
Packing straps
3
Outside carton
1
Pallet
2
Chassis-Lifting Guidelines
The chassis is not intended to be moved frequently. Before you install the system, ensure that your site is
properly prepared so that you can avoid having to move the chassis later to accommodate power sources and
network connections.
Each time you lift the chassis or any heavy object, follow these guidelines:
•
Ensure that your footing is solid, and balance the weight of the chassis between your feet.
•
Lift the chassis slowly; never move suddenly or twist your body as you lift.
•
Keep your back straight and lift with your legs, not your back. If you must bend down to lift the chassis,
bend at the knees, not at the waist, to reduce the strain on your back muscles.
Cisco ASR 902 and ASR 902U Aggregation Services Router Hardware Installation Guide
60
Preparing for Installation
Receiving the Cisco ASR 902 Router