Step 4
Place the top piece of foam over the card.
Step 5
Close the carton and seal it with packaging tape. See
for additional information.
Step 6
Place the shipping label on the outside of the carton. See
for additional information.
Line Cards (except XGLC)
Half-Height Line Card Types
The packing instructions in this section apply to the following half-height card types:
•
ASR5K-C4OC3-MM-K9
–
Channelized Line Card 2 (CLC2) [MM SFP]
•
ASR5K-C4OC3-SM-K9
–
Channelized Line Card 2 (CLC2) [SM SFP]
•
ASR5K-01100E-K9
–
Fast Ethernet Line Card (FELC)
•
ASR5K-08100E-K9
–
Fast Ethernet Line Card 2 (FLC2)
•
ASR5K-4OC3C-MM-K9
–
Optical Line Card 2 (OLC2) [MM SFP]
•
ASR5K-4OC3C-SM-K9
–
Optical Line Card 2 (OLC2) [SM SFP]
•
ASR5K-041GE-SX-K9
–
4-Port Ethernet 1000 Line Card (QGLC) [SX MM SFP]
ASR 5000 Installation Guide
269
RMA Shipping Procedures
Line Cards (except XGLC)
Содержание ASR 5000
Страница 16: ...ASR 5000 Installation Guide xvi About this Guide Contacting Customer Support ...
Страница 64: ...ASR 5000 Installation Guide 48 Installation Procedure Overview Laser Notice ...
Страница 100: ...ASR 5000 Installation Guide 84 Line Card Installation Installing the XGLC ...
Страница 118: ...ASR 5000 Installation Guide 102 Cabling the Switch Processor Input Output Line Card Central Office Alarm Wiring Example ...
Страница 122: ...ASR 5000 Installation Guide 106 Cabling the Fast Ethernet 10 100 Line Card FLC2 Interfaces ...
Страница 136: ...ASR 5000 Installation Guide 120 Cabling the Optical ATM Line Cards Cabling the Optical SFP Interface ...
Страница 140: ...ASR 5000 Installation Guide 124 Cabling the Channelized Line Cards Cabling the Optical SFP Interface ...
Страница 144: ...Figure 49 PFU Wiring Diagram ASR 5000 Installation Guide 128 Cabling the Power Filter Units Power Cable Requirements ...
Страница 148: ...ASR 5000 Installation Guide 132 Cabling the Power Filter Units Connecting the PFU to the Power Source ...
Страница 206: ...ASR 5000 Installation Guide 190 Removing and Installing SMC PC Cards Removing PC Cards ...
Страница 212: ...ASR 5000 Installation Guide 196 Replacing the Chassis Air Filter Installing the Air Filter ...
Страница 220: ...ASR 5000 Installation Guide 204 Replacing a Power Filter Unit What to do with the Failed PFU ...
Страница 266: ...ASR 5000 Installation Guide 250 Safety Electrical and EMC Certifications Korean EMC ...
Страница 270: ...ASR 5000 Installation Guide 254 Environmental Specifications Chassis Air Flow ...
Страница 280: ...ASR 5000 Installation Guide 264 Preparing a Full Height Line Card Slot Remove the Half Height Card Guide ...
Страница 294: ...ASR 5000 Installation Guide 278 Spare Component Recommendations Spare Component Recommendations ...